I am trying to create a spreadsheet relevnt to building a home.
The difficulty is with the following function:
Various trades work on the project, each has an hourly pay rate,. So I have a short list of codes for teh type of trade. e.g. Joiner, painter, plumber etc.
So in my sheet it shows that a plumber will take .3 hours to fit a radiator. I theerfore want column A to contain 'plumber' B to contain hours to work, C to be a result cost. To get the cost I need it to look at column A see that it is 'plumber' and relate that to a rate set for plumbing.
Thanks
The difficulty is with the following function:
Various trades work on the project, each has an hourly pay rate,. So I have a short list of codes for teh type of trade. e.g. Joiner, painter, plumber etc.
So in my sheet it shows that a plumber will take .3 hours to fit a radiator. I theerfore want column A to contain 'plumber' B to contain hours to work, C to be a result cost. To get the cost I need it to look at column A see that it is 'plumber' and relate that to a rate set for plumbing.
Thanks