Im trying to calculate work time and overtime. The basic hours are 8, overtime at time and a half is between 8 hours and 12 hours, and double time is over 12 hours. so if the total hours worked in G7 that day are 14:30, then how do I get cells Basic G8 = 8:00, OT 1.5 G9 = 4:00 and OT 2.0 G10 = 2:30. or it only 7:15 total in G7 then G8 = 7:15, G9 = blank, G10 = blank?
Hope that makes sense
Hope that makes sense