I have a very complex (at least complex for me) stacked bar chart to create. I have a sample that someone else created that I am trying to model after and I am having issues recreating it and need help. Here is my scenerio:
I need to create a stacked bar chart for a truckers schedule over a two month period. The driver has to document the 4 phases of the 24 hour day into three categories: 1) Off duty, 2) Sleeper, 3) Driving, 4) On Duty</SPAN></SPAN>. The driver is in and out of the four phases throughout a 24 hour period, all very randomly. The vertical axis needs to be the hours in the day, the horizontal axis is the days of the week, and in each day the four phases are color coded. I am able to get the stacked bar chart created but the way I have set the chart (not sure it is correct) with the data, excel thinks that my first entry is the same phase (i.e. the driver is always sleeping first thing [the row with that data is all sleeping time]), but it isnt always - it varies. The trucker isnt always sleeping in the beginning of the day, sometimes they are driving at that time, so I need to be able to alter the color coding or tell excel that is for a different phase. So I need to either alter the chart to direct it to the proper phase or set my data up differently on that sheet. I am good with formulas, charts are over my head!
The problem is that I dont know charts enough in excel to do this. I am up against a deadline, I need this done in 4 days, and I have been fighting with the program long enough.
Please help!! Thanks!
I need to create a stacked bar chart for a truckers schedule over a two month period. The driver has to document the 4 phases of the 24 hour day into three categories: 1) Off duty, 2) Sleeper, 3) Driving, 4) On Duty</SPAN></SPAN>. The driver is in and out of the four phases throughout a 24 hour period, all very randomly. The vertical axis needs to be the hours in the day, the horizontal axis is the days of the week, and in each day the four phases are color coded. I am able to get the stacked bar chart created but the way I have set the chart (not sure it is correct) with the data, excel thinks that my first entry is the same phase (i.e. the driver is always sleeping first thing [the row with that data is all sleeping time]), but it isnt always - it varies. The trucker isnt always sleeping in the beginning of the day, sometimes they are driving at that time, so I need to be able to alter the color coding or tell excel that is for a different phase. So I need to either alter the chart to direct it to the proper phase or set my data up differently on that sheet. I am good with formulas, charts are over my head!
The problem is that I dont know charts enough in excel to do this. I am up against a deadline, I need this done in 4 days, and I have been fighting with the program long enough.
Please help!! Thanks!