  1. R

    Nested IF formula

    <tbody> 1 A B 2 3 Date fie Reviewed 11/30/2018 4 First Date of Item Entry 12/15/2014 5 Last Stock Date 9/18/2016 6 Final Inv. Date 11/30/2014 7 Weeks on Promo Disp. 90.43 </tbody> I am trying to figure out a way to turn this into an automatic...
  2. N

    Lead time vs Request date vs POD date

    Hi, Our lead time is 6 weeks from Booking Date but some Customers put a Requested Date of further out, eg. 8 weeks from Booking Date. If I run a simple LT calculation, we will always fail to meet KPI because the we are delivering 8 weeks not 6 weeks. Is there a formula or calculation that can...
  3. R

    Trying to replace an input box with a user form

    I'm trying to replace an Input box which requires input of a Monday (19/11/2018) or (26/11/2018) or (12/11/2018) for instance, any Monday, but only monday. I want this to go on a Userform but I've never used them before. The form needs to have a manual box for inputs where a user can input a...
  4. jeff_miller

    Show list of customers that have not ordered

    I have 4 reports that I get The data in these reports is simple, It contains one column with the customer code and a second column with an order entry date The 4 reports are Orders for the last two years Orders for the last Month Orders for the last 3 weeks Orders for the last two weeks I...
  5. D

    Capture of Prior Information

    Hello, As a team, we use an excel to document accomplishments for each project we are working on. We make updates to the accomplishment section in the excel document every 2 weeks. We are looking for an automatic way to roll-up accomplishments from prior weeks into one column. Our initial...
  6. D

    Extract specific numbers from a text string, and extract range

    Hello, this is a bit of an odd query, I am trying to convert a student timetable into an excel spreadsheet (then create a calendar with it), but the data I have been given is in an awkward format. It would be easier to give an example: I receive a cell containing a list of weeks a certain class...
  7. D

    Extract specific numbers from a text string, and extract range

    Hello, this is a bit of an odd query, I am trying to convert a student timetable into an excel spreadsheet (then create a calendar with it), but the data I have been given is in an awkward format. It would be easier to give an example: I recieve a cell containing a list of weeks a certain class...
  8. J

    Pivot table help

    Hi, Each week I need to report the departments numbers to the stakeholders and they require the last 12 weeks of data split into last 6 weeks and previous 6 weeks. Is there a way for the tables to move along each week when I add new data without having to go in and adjust the dates? Thank you.
  9. K

    Help with Date formula

    I posted here and got some help, but not exactly what I need: https://www.excelforum.com/excel-general/1248831-dynamicaly-linked-cells-based-on-the-month.html#post4989975 I will do my best to explain what I need My company went to a monthly calendar reporting period with 12 reporting periods...
  10. L

    FIND Instead of Loop

    Greetings, I'm trying to avoid my LOOP which loops every 7 seconds for 5 days 24/7. Some weeks no worries. Other weeks nightmares. What I'm trying to do is quite straight forward but I have no idea other than calling each sub on a continuous loop. What I'd love is this instead of Looping over...
  11. C

    Moving Average

    Hi All, Looking for a little help with the following please, I want to find the average according to the variable in the "Average Weeks" cell. So in this example it would look at the last 3 weeks figures, Weeks 4 - 6 and work out the average = 9243 As in the example, the future cells Week...
  12. G

    Counting the Most Recent Consecutive Values

    G'day Everyone, I hope you can help me with a counting issue. I have a spreadsheet that tracks project status changes that's updated weekly. Every week project managers show their overall project status using a RAG status. The colours correspond to numbers as below. Green Amber Red I want...
  13. R

    Query - Formula needed to set it for a week date

    Hi there, I'm super glad to have found you all! I am looking for a query much like this one - Date()-Weekday(Date(),2)-56 I don't want it to be all the dates inside the 56. I just need the query to pull the Sunday from 13 weeks ago date data. Can that happen? I have a lot of different queries...
  14. D

    Data On Multiple Sheets Presented In Table

    I have no idea if I am dreaming with this but I have a series of spreadsheets (30) that output data that looks like the attached at the bottom of each sheet (one for each player). https://1drv.ms/u/s!AiBk9WsyEESSgpVxt_0_XjHt6lYRbA Now if I had to I could manually paste all these into one...
  15. D

    Dynamic Chart Title on Pivot Chart Slice Date Range

    Hi everyone, I know how to create a dynamic chart title based on the contents of a cell. What I want to achieve is a Pivot Chart dynamic chart title based on a slicer that is showing Week Commencing dates, I show the last 13 weeks, so what I want is to be able to show the first date and the...
  16. T

    Macro to move data to anoyther sheet finding the date to add it to including hiden rows?

    Hi Everyone, I thought this would be simple but i'm struggling because of a few unusaul aspects hopefully someone will understand. So I have sheet Named "All Weeks Data" This hold my data each week. in Row 1 are Dates going up one day at a time from 1st JUne 2018 My other sheet is an input...
  17. C

    Conditional Formatting

    Ladies and Gentlemen, I have just taken 2 excel courses and I was unable to figure out how to do this based on the knowledge I received. I work for a construction company and I am trying to make life easier for us all. I have a table with 3 columns. Column 1 - "Due Date" (This is the date in...
  18. K

    Forecasting and Capacity Analysis for Future Dates, Projects, and Resource Names

    Hi guys, I am running into circles with trying to figure out this issue. I am wanting to automate our current capacity planning tool for my team and want to generate some sort of forecasting ability with the forecast formula. I have heard that the newer versions of Excel contain the forecasting...
  19. I

    Gantt question

    I have set up a gantt chart using excel formulas- with the start and end dates of activities, however I have been told that the activity only happens once every 2 weeks - can anyone help with the formula to edit what I have done so far.... =IF(AND(G$9>=$D18,G$9<=$E18),"X","") This is where I...
  20. K

    creating chart based on data

    hey everyone im creating a simple task list that is seperated by days (Sunday through Saturday) 3 different task split between 3 different people beside the task there is a drop down menu for whoever is assigning tasks for the week - however though my question or problem im having is that im...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top