networkdays

  1. E

    Calculate Networkdays and Hours (Specific Business Hours)

    Excel 2013, I use the following formula to calc business days to nearest hundredth between 2 dates: =(NETWORKDAYS(H2,I2)-2)*24+(1-MOD(H2,1))*24+(MOD(I2,1)*24) Cell: H = start date Cell: I = end date I manually back out holidays Need to know how to layer deduction of holidays from time calc...
  2. S

    Help! Complex nested IF and NETWORKDAYS formula...

    I need to find the average number of days between two columns, based on multiple factors... -- removed inline image --- Basically, I would like something like IF(A:A=A;IF(B:B=S;IF(C:C=H;IF(E:E>=2014/01/01...then find AVERAGE of NETWORKDAYS between column D and E. I'm pretty new to excel, so I...
  3. C

    Dates and network dates

    Hello all, I am currently putting together a resource plan, which will in effect be a Gantt chart to show dates of people in and out of the organisation. I want to build in a few variables, for which I know there are easy function solutions, just can't get my head around them. So feedback from...
  4. E

    Average of Networkdays where cell value is true

    Hello, I am trying to get an average number of Networkdays where specific cell values are true. If the project Status is 'ongoing' or 'overdue' in Sheet2, what is the average Networkdays of the open projects for each project lead for Column C in Sheet1? Any help is appreciated, thanks...
  5. M

    Calculating time additions excluding non business hours.

    I need to create a "Calculator", which takes a date/time entered by the user, and adds a certain time (up to 100hours) based on criteria, giving a another date/time. To complicate matters, I need to exclude non business hours and weekends for some criteria, but not others. Example If Criteria...
  6. E

    Networkdays Formula IF/OR Cell has Open or Closed

    Hello Excel Gurus! I am befuddled over an IF/OR function in Column M (M2) of Networkdays where if Column L (L2) has "Closed" as a status Networkdays calculates the difference between J2(start date),K2(end date),HOLIDAYS in M2. But if Column L (L2) has "Open" as a status Networkdays calculates...
  7. M

    NETWORKDAY for a 4 day week

    I'm looking for a formula or UDF to calculate the net working days on a 4 day work week in Excel 2007. I'm attempting to calculate how late or early a project is so I need it to display +/-. Right now I'm using =NETWORKDAYS(L10,E10,0) where L10 is the Expected Completion and E10 is the Contract...
  8. D

    Networdays

    Hi, I have 2 lists of dates that I want to enter into the Networkdays function. The first is a list of public holidays and factory-closed dates that are common to all employees. The second is a list specific to each employee, holding that employee's booked leave dates. I found a thread that...
  9. M

    Calculating Networkdays, but when blank cell use todays date

    I am trying to calculate the networkdays that documents are open. I have three columns "Date Opened" "Date Closed" and "Days Open" sometimes the date closed is blank so days open returns blank using: =IF(I40<>"",NETWORKDAYS(H40,I40),"") BUT I'm trying to chance it to if its blank it will...
  10. E

    Business day interval calculation using WORKDAY and NETWORKDAYS

    Hello Excel Gurus, Can someone help with a bus day interval calculation involving WORKDAY and NETWORKDAYS calculations? If the status of the query is "Closed" and the end date is greater than the set interval, then show the number of days the query is late. If the status of the query is...
  11. J

    Formula to exclude weekends

    Hi At the moment I have a formula in place which refers to a date and then minuses today's date to leave a remaining figure:- =H3-TODAY() I want this to exclude weekends. How can I rephrase this? Thanks
  12. N

    NETWORKDAYS woes

    I'm having a aweful time getting a class tracking sheet to work. We normaly have around 30 classes running at a time and need to track what day of training each class is on for each day on a weekly calendar. Previously we were figuring it manualy but, I'm trying to save sometime. The original...
  13. G

    Help with NETWORKDAYS formula

    Column G is the "date/time in" and Column H is the "date/time out." In column I, I have "Turnaround Days" which is just H-G. For example: G2 = 03/06/2013 9:00AM H2 = 03/08/2013 3:00PM I2 = 2.25 How do I edit my formula in I2 to only calculate workdays? I want any time passed over the...
  14. S

    Trouble with scheduling

    Hi i am trying to set up an accurate schedule for a project to get a projected finish date with the following information. I am using Excel 2003 with XP Say 3 guys that work a 7-5 day (10 hours) are working on something that should take them a combined 43.7 hours leaving them with 13.7 hours to...
  15. A

    Calculating 1/2 days using Networkdays

    Hi, I have set up a spreadsheet to calculate annual leave but don't know how to set it up to calculate half days. Can anyone help please? Thanks
  16. C

    Networkdays with a 4 day week?

    Hi, I need to calculate the number of working days between 2 dates assuming a 4 day week - is this possible? Column A will have a list of future dates and in column B I need to work out the number of working days (Mon - Thurs) from Today() until the Column A date. Any help much appreciated!
  17. F

    Time Elapsed Networkdays

    I am trying to create the formula that will give me time elapsed for today using networkdays but exclude holidays. So I presently have =networkdays("1/10/2012",Today()) this works great but I need to take out some specific days. I dont need to worry about hours or minutes just some dates. I am...
  18. J

    How many days late, within date ranges rolling back from today?

    I have an order book, showing date customer requires in A, actual ship date in B. Late is defined as >2 working days late, and ABS(NETWORKDAYS) is used with IF to get "yes" or "no" in C for each shipment. If "yes" in C, then number of days late is posted in D. First, I want to use array...
  19. M

    Using a count function to work out the length of a jobs cycle

    Hi I am trying to calculate the life cycle from one date to another. Todays date in A1. The only thing is I want the count to stop when the text in a column changes from a specfic string of "WorkInProgress". So I have a start/creation date in Column C3. A payment date in Column E3...
  20. L

    Nested If? Or? And?

    I have given up the order and ghost of what this should look like. This is a view of the worksheet: F G H I J K Start Date 3/4/2012 4/30/2012 8/20/2012 Finish Date 4/28/2012 8/18/2012...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top