duration

  1. O

    Macro help (delete rows based on row value)

    Hi All, I need some help from all of you geniuses. I'd like to utilize a macro to delete rows in a spreadsheet based on a repeating set of formats. In the table below, the macro would need to start deleting at the first empty row (2) and finish with deleting the last row "Date/Time...
  2. hip2b2

    Duration Curve

    I am trying to create a Duration Curve, ie, a Scatter Graph consisting of hundreds if not thousands of data points plotted against sequential days (operating time). I need to be able to determine the value at 10% of the operating time (which may not be an integer) and draw a horizontal line...
  3. M

    Calculate amount of time between two times and deduct 30-minutes

    Hi, I'm building a shift schedule for a restaurant. I want to have one cell with start time, one cell with end time, and one cell with duration. However, I want the duration to automatically subtract a 30-minute unpaid meal-period. I found an old thread with the formula below. It works...
  4. M

    Cost per min formula

    Hi All, I have a call costs spreadsheet that shows me call cost and call duration. How can I work out the cost per min of that call? I have duration in column G and cost in Column H Duration shown as xx:xx:xx Cost shown as £xx.xx Thanks all.
  5. W

    Gant Charts, Conditional Formatting and Resource Calculation

    Hello, I am trying to set up a formula in a workbook to firstly highlight a range of cells between two given dates. Secondly I am trying to populate these cells based on start and finish dates and the quantity of resource for a given item. Duration Column J =((H49-G49)/5)+0.2 (Where 0.2 is 1...
  6. T

    VBA Code to Find Row Number and Copy it to Adjacent Cell

    With two sheets, a Feeder sheet and a Database, I have two columns of data I would like matched. On the Feeder, all data is in rows: VALUE 1 -Location Time Cost Duration VALUE 2 -Location Time Cost Duration VALUE 3 -Location Time Cost Duration VALUE 4 -Location Time Cost Duration On Database...
  7. J

    SUMIFS using multiple criteria and removing rows based on duplicates in another column

    It's possibly my search-fu is failing me here, or more likely I simply don't understand the answers I've found. I'm working on a project (due to some backend db errors that will eventually be resolved) that requires me to tabulate the duration of certain phone states. Unfortunately, the...
  8. A

    SQL/SSRS Date filter

    Hi all Hopefully I have posted this in the correct forum. I am trying to create a report that shows who is off today. I have three fields that show the date_from the date_to and the Duration (in days) The issue I am having is where someone has taken the full week off for example 12/02/2018...
  9. D

    Create a type of psuedo gantt chart

    I'd like to create a 'pseudo' gantt chart of sorts My Project data is on Columns A:U, TimelineDates start in Column V, Column A is the Project number and is always a number, never blank or NULL, There are 2 header lines, so the Project data starts in row A3...
  10. S

    Summing Time Not Working

    I have rows/columns of times that looks like this: <tbody> Date Scheduled Appt Duration Actual Appt Duration AQR Appt Duration 12/1/17 6:00 4:37 5:03 12/4/17 0:00 0:00 0:00 12/5/17 6:00 5:02 7:10 12/6/17 5:30 2:14 2:34 12/7/17 6:00 4:00 4:46 12/8/17 0:00 0:00 0:00 12/11/17 6:00...
  11. L

    Move multiple shapes wrt dates using VBA

    I got data as mentioned below in excel. All the activities are split in two different periods. For each such period I have to create a shape and place it according to its date and duration along the same row. e.g. in the below mentioned table for activity A, I will create two rectangular shapes...
  12. masud8956

    Inserting duration in a column without using colon and adding them up

    I have a column with 56 rows. I want to insert duration in [h]:mm format without having to type colon. For that I formatted input cells using 0\:00 to get a return at row 57. The problem is, while adding up those duration I am getting erroneous results. e.g. 0:30 and 0:40 are added up as 0:70...
  13. A

    Summary Data

    Hi, This is a simplified version of what I am trying to do: ** Spreadsheet being amended ** You can see that this is a time recording spreadsheet for visits to clients. To summarise, on day 1 the technician visits a client, selects the client name from a dynamic drop down list, enter the...
  14. F

    Pivot tables: Calculating Duration from Min and Max date columns

    Hello, I have a pivot table that pulls data from time card records for projects. Each project has several time card entries and I want to find the duration of a project based on the first time card entry (earliest date) and the last time card entry (last date) for each project. I have a pivot...
  15. C

    Excel Gantt chart showing milestone tasks (zero duration)

    Hello I am trying to create a gantt chart in excel with stacked bar chart It works fine for tasks with duration greater than zero, but for tasks with zero duration, nothing appears on chart as it is stacked bar diagram so i try to draw milestone tasks with scatter chart seperately which works...
  16. K

    negative duration in days not showing in chart

    Hello All, the negative duration in this table isn't showing in the chart. Date range is at the top, task name is vertical axis Sheet1 <tbody>#cacaca[/URL] "] B C D E #cacaca[/URL] , align: center"]5 Task Name Start End Duration (days) #cacaca[/URL] , align: center"]6...
  17. L

    Pivot Table - using the Average on a field but not including maximum value

    Hi, I have a created a pivot table that shows the duration of run times. I am doing an average on the duration but want to remove the maximum value from the average as there are valid reasons for the run time to extremely longer than the remaining duration run times. How do I eliminate the max...
  18. L

    Difference between hours and time

    Hi there, I am looking for some help regarding identifying differences between a recorded amount of hours and the recorded duration (Start/end Time). In the following table Duration is calculated using "=B2-A2+(A2>L2). Row 1 would not need highlighting as duration is less than 60 minutes over...
  19. D

    Formula for calendar population

    hi guys, Need your help i have you help with a formula i need to populate a calendar according to a table that i have. at the moment i was able to do it for the time using the below formula...
  20. R

    Splitting activity duration by half an hour intervals

    Hi, Could you please help me with the following task: have a long list of activities and their start and end time. What I need is to split the duration of each activity by half an hour intervals as my example below. The blue intervals show beginning of each interval, for example interval...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top