completed

  1. M

    Completion & Pending tasks based on dates.

    MS Excel 2007. Col R contains dates varying from 1st April 2018 to 31st December 2018 in DD/MM/YYYY format. (Dates showing task to be completed). Col S formatted in date format DD/MM/YYYY. The date is entered as and when the task is completed. For example R11 shows date 17-04-2018. Task...
  2. D

    Display Date If...

    <tbody> Hello, what formula would I use to have cell H1 display the date in which an employee was the most productive for the month. I have a "Date" column (A1) that the user will enter the current date below per day. There are 3 other "catagorized" columns (cells B1, C1, D1) that will keep...
  3. M

    I need a macro that will run numbers 0 threw to 20

    Hi I need a macro that will run numbers 0 threw to 20 in cell E1 sheet B0_Charts with 1 second intervals between each count and the macro ends once the number 20 is completed. How would the macro look like? Thank you MM
  4. N

    INDEX MATCH with two columns of text?

    Hi all, hope somebody can help. I have two columns of text for each record (risk): - Column F is a score (Red, Amber, Green) - Column L is a Status (To Begin, On hold, In Progress, Completed, Cancelled) I want to put in a formula that will count the number of Reds that are NOT Completed or...
  5. N

    Conditional Formatting with Dates

    I have a training spreadsheet that I am tracking 16 different trainings for about 30 people. I have the dates the training was complete out next to their names. All of the training is annual, so I would like to have the colors change as the exp date approaches. If training was completed...
  6. D

    Help with If Statement = early/late or completed

    Hi, I'm having trouble working out how to combine a if statement to return if works have been completed early, late, incomplete or completed. so im working with the following info planned date early start date latest completion date First completed date this is what I have created so far -...
  7. D

    Mark Completed Mail Merge Rows in Excel

    I have a spreadsheet that is used for a mail merge and it is constantly having rows added. Is there a way to "Mark" a row that has been successfully mail merged with Word? I am thinking along the lines of adding a "X" in the last column, so when I do another mail merge I can set it up to skip...
  8. E

    Creating Scenario matrix

    I'm trying to create a scenario matrix for sequences of 4 constrained outputs. For each scenario below, I have a maximal number of laps completed by each rider (9), a minimum number completed by each rider (0.5) and the number of laps completed by each rider can vary in increments of 0.5. The...
  9. C

    Calculating time

    Good morning is it possible to calculate the time difference between two cells below even though it has time and date? Started Date & Time Completed Date & Time 18/12/2017 16:05 18/12/2017 16:16 Thanks
  10. W

    Lots of nested IF's after meeting certain criteria?

    Hi All, I hope you're enjoying your Sunday evening. I have the following table that needs a formula inserting in the 'Status' column Table: <tbody> Unique Identifier First Name Last Name Grade Status Completed On + Years Due 12345 Jane Doe 5 Not Applicable 1 12346 John Doe 5 Not...
  11. B

    RE: Formula help

    RE: Formula help Hi All I am after some help if you dont mind.. I basically have a sheet called "Survey's & Checklists" and within that I have a Cell E3 (PS Survey Completed) for which I would enter "Yes". I also have another cell in that sheet (PS Survey Completed Date) G3. I also contains a...
  12. D

    vlookup at its limit

    Hi All, Ive got a google sheet which automatically updates once my drivers log a fault with their vehicle. The action status of the vehicle changes from available to unavailable when the repairer places the vehicle in-progress meaning they are working on it. i then use vlookups to match the...
  13. G

    Display values of all rows from another sheet which contain a certain value

    Hey guys, I'm building a form which will record all the tasks that are pending and those that have been completed. They differ by type, say A, B, C and D. The task status is on the column 'A'!B:B, 'B'!B:B, 'C'!B:B, 'D'!B:B I wanted to generate a report on another sheet. I'd create a...
  14. J

    IF Formula for worksheet with several tabs

    I am working with a large spreadsheet that has many tabs across the bottom (a new tab for each day). Column A has specific accounts (more than 100+ rows). Colum DJ is the column I need to review daily to see if the specific task in DJ has been completed. Once the task has been done that day...
  15. M

    Formula inquiry. Multiple If statement outcomes

    Hey everyone, I've spent the past few days banging my head off the wall with this one. What I need to do is take the recurring and completed into the equation. So essentially like this; If reccuring is Yes, than the formula result should be On time. The second part I need to work into it...
  16. G

    SMALL function with multiple IF statements (or alternative suggestion)

    Hi, I am new to this forum and this is my 1st post for help. I have outlined the problem below: <tbody> A B C D E F G H I J K 1 Job number visit date Job type Status 1st 2nd 3rd 4th 5th 2 23502-3 04/04/2017 Contract Visit completed 1 2 3 4 5 3 23502-4...
  17. J

    General Help: Gettign 424 Must be simple

    Getting Runtime error 424 Object Expected. Attempting to get several functions to run, I'm encountering an error from go. I still have much learnign to do in Excel, I'm not really sure what to research on this, though. Any help is welcome. Error is occurring on the second line where I am...
  18. S

    Using countif and counta together

    I am having difficulties in finding the right formula to return a number of completed tasks. I am working on 2 sheets, the first is an overview sheet giving a headline of outstanding and completed tasks for individual projects. The second sheet is a full task list for each project. I want to...
  19. M

    Finding Combinations in a Row Using Macros

    Hey Guys, I need your help to solve my issue. In my sales report I column i have to find my completed tasks. Typically to identify tasks in I column, it will start with cell contains Completed Task and ends in cells contains *****. Some time some cells contains ***** alone which is incomplete...
  20. E

    Track input on daily basis

    Hello all, here is my dilemma: I have a spreadsheet that lists a number of items that need to be completed by the end of a given week, and the list can range from 100-140 from week to week. I already have working formulas that track the total tasks for the week, how many completed, how many...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top