Task Names in MS Project

macrosandcells

Board Regular
Joined
Jul 12, 2004
Messages
92
Hi,

not really sure if anyone is familiar with microsoft project but it is worth a try

I am trying to find a way to see if there is a way that i can detect if a string is repeated on the same date.

what i mean is each task name is a combination of words or "strings"

i would like to detect if two task names assigned for the same day have the same string.

if soeone can help me i can provide more info

thanks
 

Excel Facts

What is the last column in Excel?
Excel columns run from A to Z, AA to AZ, AAA to XFD. The last column is XFD.

Forum statistics

Threads
1,223,270
Messages
6,171,102
Members
452,379
Latest member
IainTru

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top