taking info from a data base, and putting it into MSProject

jclairmo1425

New Member
Joined
Aug 5, 2003
Messages
25
I have a very big and messy excel file with too much information for what the scope is for my next project. I then took only pieces (certain columns ) from the excel file and linked them to a data base, which updates back and forth. Now, i want to take the data base that i have linked to that excel file and graphically represent the calendar/scheduling information in MS Project...is there any way to do this...sorry if its unclear...im really rusty with all these programs....thanks a lot everyone
 

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top