JustS0meGuy
New Member
- Joined
- Jul 16, 2019
- Messages
- 2
Hello,
I have to do these tedious time sheets everyday. I'm trying to spend some upfront time to hopefully same me time in the long run. Below is a link to an example file.
I found code to get unique project numbers from the list, but I can't figure out how to sort them (yellow column)
With the format used, the date is only entered once for the entire day. As a result I can't figure out a non-VBA way to sum the hours under the red highlighted area. I can't figure out a good VBA approach with my (very) limited skills. Would any of you kind VBA kung-fu masters be able to assist?
https://www.dropbox.com/sh/s9khekp5rtear4p/AAAozJv4tiJE2lpKuNAJp8d7a?dl=0
I have to do these tedious time sheets everyday. I'm trying to spend some upfront time to hopefully same me time in the long run. Below is a link to an example file.
I found code to get unique project numbers from the list, but I can't figure out how to sort them (yellow column)
With the format used, the date is only entered once for the entire day. As a result I can't figure out a non-VBA way to sum the hours under the red highlighted area. I can't figure out a good VBA approach with my (very) limited skills. Would any of you kind VBA kung-fu masters be able to assist?
https://www.dropbox.com/sh/s9khekp5rtear4p/AAAozJv4tiJE2lpKuNAJp8d7a?dl=0