SUMIFS based on multiple criteria and between date

Lukma

Active Member
Joined
Feb 12, 2020
Messages
259
Office Version
  1. 2019
  2. 2016
Platform
  1. Windows
Good day friends

I need to help out with a formula on my data sheet the problem is the given tasks and its required and doing so it will take a long and stressful time
so i need a formula that and sum total for specific criteria between date rage.

From Column A i have all Vessel names listed
From Column B Activity Range
From Column D to Colum AH i have date numbers
Now
Column AL i have Vessel Name
Column AM Start Date
Column AN Return Date
From AO to AX i have list criteria Name from Column B Activities

So i need to sumifs based on multiple criteria between dates
So let say from Column AM date 2 and AN 7
then i need to sum Column D date 2 to 7 all time based on Criteria

Thank i will appreciate any one with helping and and i hope am able to explain better

regards

Book2
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAX
1Vessel NamesOperational Month & Date12345678910111213141516171819202122232425262728293031Total / HrsIn DaysVessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeWaiting VTSWaiting COP MOSBWorking MOSBSteamingWorking OffshoreWorking Others Marine SupplyWaiting OffshoreWaiting DaylightWaiting WeatherMaintenance
2A-CHLOEWorking MOSBADNOC Base Jetty Cargo Operation15.4155.314.51.21114.412.92.892.53.85A-CHLOE02/01/23 06:2007/01/23 01:20
3A-CHLOEWaiting COP MOSBWaitng ADNOC Berthing Instruction00.00A-CHLOE07/01/23 01:2011/01/23 18:30
4A-CHLOEWaiting COP MOSBWaiting Base Cargo Operation00.00A-CHLOE11/01/23 18:3019/01/23 01:10
5A-CHLOEWaiting ADOF SupplierWaitng Drilling Material00.00A-CHLOE19/01/23 01:1025/01/23 08:50
6A-CHLOEWaiting COP MOSBCargo Operation Suspended00.00A-CHLOE25/01/23 08:5002/02/23 07:00
7A-CHLOEWaiting VTSWaiting VTS permission1.64.3813.90.58A-GRACE01/01/23 10:2006/01/23 06:50
8A-CHLOEWaiting VTSWaiting on Channel Closure00.00A-GRACE06/01/23 06:5010/01/23 01:25
9A-CHLOEWaiting WeatherWaitinhg WOW , FOG / POOR VISIBILITY00.00A-GRACE10/01/23 01:2519/01/23 08:00
10A-CHLOESteaming In Transit / Steaming to Location 3.18.6711.43.911.8130.53.37.59.9803.33A-GRACE19/01/23 08:0025/01/23 01:30
11A-CHLOEWorking Free-PortFree-Port / Mus-Port00.00A-GRACE25/01/23 01:3031/01/23 18:25
12A-CHLOEWaiting COP Free-PortStandby location ( Waiting )00.00A-GRACE31/01/23 18:2503/02/23 23:10
Sheet1
Cell Formulas
RangeFormula
AI2:AI12AI2=SUM(D2:AH2)
AJ2:AJ12AJ2=AI2/24
 

Excel Facts

Square and cube roots
The =SQRT(25) is a square root. For a cube root, use =125^(1/3). For a fourth root, use =625^(1/4).
There are things I don't understand.
From Column D to Colum AH i have date numbers
I can see 15.4 as April 15th. But there is no year. Further to the right is 15. What kind of date number would that be without month and year?
So i need to sumifs based on multiple criteria between dates
Not clear what you mean by "multiple criteria".
So let say from Column AM date 2 and AN 7
Neither 2 nor 7 are in these columns. Because they are no dates.
hen i need to sum Column D date 2 to 7 all time based on Criteria
Column D has no data in it.
and i hope am able to explain better
Please do explain better. And show the expected outcome.
 
Upvote 0
does this work for you
=SUMPRODUCT(($D$2:$AH$20)*($A$2:$A$20=$AL2)*($B$2:$B$20=AO$1)*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))

i'm assuming just looking at the day() and the month or year does not matter - that will depend a lot on how you structure the data

Expected results are always good to show in a sample - so any formula provided can be tested against the results you expect


Book1
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAX
1Vessel NamesOperational Month & Date12345678910111213141516171819202122232425262728293031Total / HrsIn DaysVessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeWaiting VTSWaiting COP MOSBWorking MOSBSteamingWorking OffshoreWorking Others Marine SupplyWaiting OffshoreWaiting DaylightWaiting WeatherMaintenance
2A-CHLOEWorking MOSBADNOC Base Jetty Cargo Operation15.4155.314.51.21114.412.92.892.53.85416667A-CHLOE1/2/23 6:201/7/23 1:201.6015.418.7000000
3A-CHLOEWaiting COP MOSBWaitng ADNOC Berthing Instruction00A-CHLOE1/7/23 1:201/11/23 18:300020.311.4000000
4A-CHLOEWaiting COP MOSBWaiting Base Cargo Operation00A-CHLOE1/11/23 18:301/19/23 1:1012.303240.6000000
5A-CHLOEWaiting ADOF SupplierWaitng Drilling Material00A-CHLOE1/19/23 1:101/25/23 8:500014.411.3000000
6A-CHLOEWaiting COP MOSBCargo Operation Suspended00A-CHLOE1/25/23 8:502/2/23 7:000000000000
7A-CHLOEWaiting VTSWaiting VTS permission1.64.3813.90.57916667A-GRACE1/1/23 10:201/6/23 6:500000000000
8A-CHLOEWaiting VTSWaiting on Channel Closure00A-GRACE1/6/23 6:501/10/23 1:250000000000
9A-CHLOEWaiting WeatherWaitinhg WOW , FOG / POOR VISIBILITY00A-GRACE1/10/23 1:251/19/23 8:000000000000
10A-CHLOESteaming In Transit / Steaming to Location 3.18.6711.43.911.8130.53.37.59.9803.33333333A-GRACE1/19/23 8:001/25/23 1:300000000000
11A-CHLOEWorking Free-PortFree-Port / Mus-Port00A-GRACE1/25/23 1:301/31/23 18:250000000000
12A-CHLOEWaiting COP Free-PortStandby location ( Waiting )00A-GRACE1/31/23 18:252/3/23 23:100000000000
13
Sheet1
Cell Formulas
RangeFormula
AI2:AI12AI2=SUM(D2:AH2)
AJ2:AJ12AJ2=AI2/24
AO2:AX12AO2=SUMPRODUCT(($D$2:$AH$20)*($A$2:$A$20=$AL2)*($B$2:$B$20=AO$1)*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))
 
Upvote 0
Solution
Dear etaf

many thanks (y):) it's super great, just exactly what i need to get my work faster and easy i was so worried thinking of this all night.

my concern was raised by Shift-del, which i understand that the date from column D to AH is just number, but am super happy that etaf understand it all.

now i have to increase the range to complete my report today

Am also using this to say thanks to everyone out there.

Regards



does this work for you
=SUMPRODUCT(($D$2:$AH$20)*($A$2:$A$20=$AL2)*($B$2:$B$20=AO$1)*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))

i'm assuming just looking at the day() and the month or year does not matter - that will depend a lot on how you structure the data

Expected results are always good to show in a sample - so any formula provided can be tested against the results you expect


Book1
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAX
1Vessel NamesOperational Month & Date12345678910111213141516171819202122232425262728293031Total / HrsIn DaysVessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeWaiting VTSWaiting COP MOSBWorking MOSBSteamingWorking OffshoreWorking Others Marine SupplyWaiting OffshoreWaiting DaylightWaiting WeatherMaintenance
2A-CHLOEWorking MOSBADNOC Base Jetty Cargo Operation15.4155.314.51.21114.412.92.892.53.85416667A-CHLOE1/2/23 6:201/7/23 1:201.6015.418.7000000
3A-CHLOEWaiting COP MOSBWaitng ADNOC Berthing Instruction00A-CHLOE1/7/23 1:201/11/23 18:300020.311.4000000
4A-CHLOEWaiting COP MOSBWaiting Base Cargo Operation00A-CHLOE1/11/23 18:301/19/23 1:1012.303240.6000000
5A-CHLOEWaiting ADOF SupplierWaitng Drilling Material00A-CHLOE1/19/23 1:101/25/23 8:500014.411.3000000
6A-CHLOEWaiting COP MOSBCargo Operation Suspended00A-CHLOE1/25/23 8:502/2/23 7:000000000000
7A-CHLOEWaiting VTSWaiting VTS permission1.64.3813.90.57916667A-GRACE1/1/23 10:201/6/23 6:500000000000
8A-CHLOEWaiting VTSWaiting on Channel Closure00A-GRACE1/6/23 6:501/10/23 1:250000000000
9A-CHLOEWaiting WeatherWaitinhg WOW , FOG / POOR VISIBILITY00A-GRACE1/10/23 1:251/19/23 8:000000000000
10A-CHLOESteaming In Transit / Steaming to Location 3.18.6711.43.911.8130.53.37.59.9803.33333333A-GRACE1/19/23 8:001/25/23 1:300000000000
11A-CHLOEWorking Free-PortFree-Port / Mus-Port00A-GRACE1/25/23 1:301/31/23 18:250000000000
12A-CHLOEWaiting COP Free-PortStandby location ( Waiting )00A-GRACE1/31/23 18:252/3/23 23:100000000000
13
Sheet1
Cell Formulas
RangeFormula
AI2:AI12AI2=SUM(D2:AH2)
AJ2:AJ12AJ2=AI2/24
AO2:AX12AO2=SUMPRODUCT(($D$2:$AH$20)*($A$2:$A$20=$AL2)*($B$2:$B$20=AO$1)*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))
 
Upvote 0
I may have NOT provided what you want - so please check the results are exactly as needed


which i understand that the date from column D to AH is just number,
yes dates are numbers , based on 0/1/1900 and each day increments by 1
22nd March 24 is the number 45373
23rd March 24 will be 45374
so incremented by 1


you only have 1 - 31
in column D to AH is just number,
and hence i thought you wanted to sum based on what the day of the month was - 1st,2nd,3rd,4th etc

BUT , on reflection , THIS MAY NOT BE doing what you WANT
As Shift-del, has said, NO Dates in D to AH just numbers

and so it is adding up based on the day of the month

1st jan 24 to 1st feb 24 - will only look in the column 1 - it will NOT add up from column 1 to 31 - as that is a full month which is 1-jan to 1-feb
Just the days starting the 1st - regardless of the dates

Hence why i say
i'm assuming just looking at the day() and the month or year does not matter - that will depend a lot on how you structure the data

Expected results are always good to show in a sample - so any formula provided can be tested against the results you expect

and
DAY(date cell) will just get the day of the month
hence
*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))
and that the data is looking at the day of the start and stop dates
 
Last edited:
Upvote 0
I may have NOT provided what you want - so please check the results are exactly as needed



yes dates are numbers , based on 0/1/1900 and each day increments by 1
22nd March 24 is the number 45373
23rd March 24 will be 45374
so incremented by 1


you only have 1 - 31

and hence i thought you wanted to sum based on what the day of the month was - 1st,2nd,3rd,4th etc

BUT , on reflection , THIS MAY NOT BE doing what you WANT
As Shift-del, has said, NO Dates in D to AH just numbers

and so it is adding up based on the day of the month

1st jan 24 to 1st feb 24 - will only look in the column 1 - it will NOT add up from column 1 to 31 - as that is a full month which is 1-jan to 1-feb
Just the days starting the 1st - regardless of the dates

Hence why i say


and
DAY(date cell) will just get the day of the month
hence
*($D$1:$AH$1>=DAY($AM2))*(($D$1:$AH$1<=DAY($AN2))))
and that the data is looking at the day of the start and stop dates
Good Day Etaf

based on your comment I also see that is not picking the last days of the month however can you look into this since I have some days in the month for email
January 2023 is not picking any entry

can you into the formula if something can be updated for me

However Please sorry for my late respond was off for a while

Thanks


Working.xlsx
AMANAOAPAQARASATAUAVAWAXAYAZ
1Vessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeChannel Waiting Time & VTS DelayWaiting Cargo Operation & Berth (MOSB Base)Work Time at MOSBTotal SteamingInfield SteamingTotal Working Hours at Offshore LocationsWorking Others Marine Supply Waiting Time at Offshore LcoationsWaiting Daylight ComplexWaiting On WeatherMaintenance Days
2LCT ADNOC-101001/01/23 22:5005/01/23 22:305.95.611.761.3 20.3 9.5 5.7 
3LCT ADNOC-101005/01/23 22:3009/01/23 06:50 13.920.957.2 16.6 5.3 6.1 
4LCT ADNOC-101009/01/23 06:5014/01/23 10:20 9.917.946.3 11.3 35.2 23.4 
5LCT ADNOC-101014/01/23 10:2017/01/23 20:40 13.27.945.3 12.5 5.5 11.6 
6LCT ADNOC-101017/01/23 20:4021/01/23 21:55 1515.248.8 10.4 3.6 27 
7LCT ADNOC-101021/01/23 21:5525/01/23 01:35 32.217.345.8 14.9 4 5.8 
8LCT ADNOC-101025/01/23 01:3531/01/23 10:20 22.75.428.9 6.8 7.1 97.1 
9LCT ADNOC-101031/01/23 10:2004/02/23 02:05           
Sheet1
Cell Formulas
RangeFormula
AP2:AZ9AP2=IFERROR(1/(1/SUMPRODUCT(($E$2:$AI$1728)*($A$2:$A$1728=$AL2)*($B$2:$B$1728=$AM2)*($C$2:$C$1728=AP$1)*($E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2))))),"")
 
Upvote 0
that is not all the sheet - can you post the sheet and also show where its not working
just want to make sure i look at the real data and cells
 
Upvote 0
Dear Etaf

Many thanks for your response, in addition, I also tried to extend the range due to different Vessel names in Column B but unfortunately, I could not result
to explain in detail I have compiled all month's reports in one sheet then I have a list of each month in column A which means am to see the next entry of the vessel report for the following month till December.. after that, I decide to extend the range criteria but each time I tried no result is found, trying to find an easy way I could get the job done fast for all vessel each month.

However, i also need to ask a few questions is there a way to post the full datasheet as am using xl2bb to post mini sheet

Thank you once more


Working.xlsx
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAXAYAZ
1Vessel NamesCriOperational Month & Date12345678910111213141516171819202122232425262728293031Total / HrsIn DaysVessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeChannel Waiting Time & VTS DelayWaiting Cargo Operation & Berth (MOSB Base)Work Time at MOSBTotal SteamingInfield SteamingTotal Working Hours at Offshore LocationsWorking Others Marine Supply Waiting Time at Offshore LcoationsWaiting Daylight ComplexWaiting On WeatherMaintenance Days
2JanuaryLCT ADNOC-1010Work Time at MOSBADNOC Base Jetty Cargo Operation0.810.20.79.910.37.60.310.53.21.511.93.91.572.33.01JanuaryLCT ADNOC-101001/01/23 22:5005/01/23 22:300.250.230.492.55 0.85 0.40 0.24 
3JanuaryLCT ADNOC-1010Waiting Cargo Operation & Berth (MOSB Base)Waitng ADNOC Berthing Instruction1.95.310.911.729.81.24JanuaryLCT ADNOC-101005/01/23 22:3009/01/23 06:50 0.580.872.38 0.69 0.22 0.25 
4JanuaryLCT ADNOC-1010Waiting Cargo Operation & Berth (MOSB Base)Waiting Base Cargo Operation3.30.44.63.35.60.20.69.71138.71.61JanuaryLCT ADNOC-101009/01/23 06:5014/01/23 10:20 0.410.751.93 0.47 1.47 0.98 
5JanuaryLCT ADNOC-1010Waiting Time at Offshore LcoationsWaitng Drilling Material00.00JanuaryLCT ADNOC-101014/01/23 10:2017/01/23 20:40 0.550.331.89 0.52 0.23 0.48 
6JanuaryLCT ADNOC-1010Waiting Cargo Operation & Berth (MOSB Base)Cargo Operation Suspended6.35.311.60.48JanuaryLCT ADNOC-101017/01/23 20:4021/01/23 21:55 0.630.632.03 0.43 0.15 1.13 
7JanuaryLCT ADNOC-1010Channel Waiting Time & VTS DelayWaiting VTS permission00.00JanuaryLCT ADNOC-101021/01/23 21:5525/01/23 01:35 1.340.721.91 0.62 0.17 0.24 
8JanuaryLCT ADNOC-1010Channel Waiting Time & VTS DelayWaiting on Channel Closure5.95.90.25JanuaryLCT ADNOC-101025/01/23 01:3531/01/23 10:20 0.950.231.20 0.28 0.30 4.05 
9JanuaryLCT ADNOC-1010Waiting On WeatherWaitinhg WOW , FOG / POOR VISIBILITY11.67.519.55.823.623.42420.3135.75.65JanuaryLCT ADNOC-101031/01/23 10:2004/02/23 02:05           
10JanuaryLCT ADNOC-1010Total Steaming In Transit / Steaming to Location 4.64.77.88.41.511.93.90.41.312.52.412.53.83.30.40.63.78.30.592.53.85FebruaryLCT ADNOC-101004/02/23 02:0507/02/23 01:40 1.520.661.38 0.35 0.10   
11JanuaryLCT ADNOC-1010Working Free PortFree-Port / Mus-Port00.00FebruaryLCT ADNOC-101007/02/23 01:4012/02/23 02:10 1.040.711.30 0.45 0.18 2.32 
12JanuaryLCT ADNOC-1010Waiting on Free portStandby location ( Waiting )00.00FebruaryLCT ADNOC-101012/02/23 02:1015/02/23 18:45 0.740.341.75 0.57 0.60   
13JanuaryLCT ADNOC-1010Waiting On WeatherWaitinhg WOW , FOG / POOR VISIBILITY00.00FebruaryLCT ADNOC-101015/02/23 18:4523/02/23 22:50 2.680.432.36 0.47 0.27 2.80 
14JanuaryLCT ADNOC-1010Total SteamingIn Transit / Steaming to Location 00.00FebruaryLCT ADNOC-101023/02/23 22:5028/02/23 02:25 1.420.882.55 0.92 0.24   
15JanuaryLCT ADNOC-1010Total Working Hours at Offshore LocationsAsseifiya Island0.42.457.80.33FebruaryLCT ADNOC-101028/02/23 02:2503/03/23 05:00           
16JanuaryLCT ADNOC-1010Total Working Hours at Offshore LocationsEttouk Island5.96.42.72.417.40.73MarchLCT ADNOC-101003/03/23 05:0006/03/23 15:00 1.440.401.62 0.36 0.19   
17JanuaryLCT ADNOC-1010Total Working Hours at Offshore LocationsAl Ghallan Island3.22.50.33.63.94.75.79.26.839.91.66MarchLCT ADNOC-101006/03/23 15:0011/03/23 12:50 2.860.981.58 0.48 0.11   
Sheet1
Cell Formulas
RangeFormula
AJ2:AJ17AJ2=SUM(E2:AI2)
AK2:AK17AK2=AJ2/24
AL2:AL17AL2=IFERROR(EOMONTH(AN2,-1)+1,"")
AP2:AZ17AP2=IFERROR(1/(1/SUMPRODUCT(($E$2:$AI$1728)*($A$2:$A$1728=$AL2)*($B$2:$B$1728=$AM2)*($C$2:$C$1728=AP$1)*($E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2)))))/24,"")
 
Upvote 0
OR if you cannot get XL2BB to work, or have restrictions on your PC

then put the sample spreadsheet onto a share

I only tend to goto OneDrive, Dropbox or google docs , as I'm never certain of other random share sites and possible virus.
Please make sure you have a representative data sample and also that the data has been desensitised, remember this site is open to anyone with internet access to see - so any sensitive / personal data should be removed

Make sure you set any share or google to share to everyone
 
Upvote 0
you seem to be using a different formula now

=IFERROR(1/(1/SUMPRODUCT(($E$2:$AI$1728)*($A$2:$A$1728=$AL2)*($B$2:$B$1728=$AM2)*($C$2:$C$1728=AP$1)*($E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2))))),"")

add up the values in
$E$2:$AI$1728 which comes to - 451.6
but only if
column a = al2 = 1st jan 23
=SUMPRODUCT((E2:AI17)*(A2:A17=AL2))
which a2 to a17 is - so stll 451.6

=SUMPRODUCT((E2:AI17)*(A2:A17=AL2)*($B$2:$B$17=$AM2))
now only if b has am2
LCT ADNOC-1010
they all do - so stll 451.6

next column c = ap1
Channel Waiting Time & VTS Delay
so now result is 5.9

next
$E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2))))),
day an2 = 1
day ao2 = 5
still 5.9 , as that intered for day 2
so still 5.9

1/1/5.9
=
0.169491525

not sure on question
if i change an2 - so its the 2nd and also ao2 to 2nd
still works

Book3
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAXAYAZBA
1Vessel NamesCriOperational Month & Date12345678910111213141516171819202122232425262728293031Total / HrsIn DaysVessel NameeStart Date & Time (Arrival Time at MOSB)Return to MOSB Date & TimeChannel Waiting Time & VTS DelayWaiting Cargo Operation & Berth (MOSB Base)Work Time at MOSBTotal SteamingInfield SteamingTotal Working Hours at Offshore LocationsWorking Others Marine Supply Waiting Time at Offshore LcoationsWaiting Daylight ComplexWaiting On WeatherMaintenance Days
21/1/23LCT ADNOC-1010Work Time at MOSBADNOC Base Jetty Cargo Operation0.810.20.79.910.37.60.310.53.21.511.93.91.572.33.0125Sunday 1 January 2023LCT ADNOC-1010Monday 2 January 2023Monday 2 January 20230.2458333330.13750.4250.191666667       0.169491525
Sheet1
Cell Formulas
RangeFormula
AJ2AJ2=SUM(E2:AI2)
AK2AK2=AJ2/24
AL2AL2=IFERROR(EOMONTH(AN2,-1)+1,"")
AP2:AZ2AP2=IFERROR(1/(1/SUMPRODUCT(($E$2:$AI$1728)*($A$2:$A$1728=$AL2)*($B$2:$B$1728=$AM2)*($C$2:$C$1728=AP$1)*($E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2)))))/24,"")
BA2BA2=1/1/(SUMPRODUCT((E2:AI17)*(A2:A17=AL2)*($B$2:$B$17=$AM2)*($C$2:$C$17=AP$1)*($E$1:$AI$1>=DAY($AN2))*(($E$1:$AI$1<=DAY($AO2)))))






 
Upvote 0

Forum statistics

Threads
1,224,823
Messages
6,181,177
Members
453,021
Latest member
Justyna P

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top