Stacked Column Graph with progress

sbaraily

New Member
Joined
Sep 30, 2010
Messages
14
Hi All ,

I am a part of testing team which generates test data for various workstreams. Each such workstream requires that we setup test data on a set of interfaces under testing. I need to report on daily basis how many test data I created for each of these interfaces.

So the scenario I have at hand is:

<TABLE style="WIDTH: 172pt; BORDER-COLLAPSE: collapse" cellSpacing=0 cellPadding=0 width=228 border=0 x:str><COLGROUP><COL style="WIDTH: 84pt; mso-width-source: userset; mso-width-alt: 4096" width=112><COL style="WIDTH: 27pt; mso-width-source: userset; mso-width-alt: 1316" width=36><COL style="WIDTH: 29pt; mso-width-source: userset; mso-width-alt: 1389" width=38><COL style="WIDTH: 32pt; mso-width-source: userset; mso-width-alt: 1536" width=42><TBODY><TR style="HEIGHT: 12.75pt" height=17><TD class=xl23 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black 0.5pt solid; BORDER-LEFT: black 0.5pt solid; WIDTH: 84pt; BORDER-BOTTOM: black 0.5pt solid; HEIGHT: 12.75pt; BACKGROUND-COLOR: transparent" width=112 height=17>Workstreams</TD><TD class=xl23 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black 0.5pt solid; BORDER-LEFT: black; WIDTH: 27pt; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" width=36>Interface 1</TD><TD class=xl23 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black 0.5pt solid; BORDER-LEFT: black; WIDTH: 29pt; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" width=38>Interface 2</TD><TD class=xl23 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black 0.5pt solid; BORDER-LEFT: black; WIDTH: 32pt; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" width=42>Interface 3</TD></TR><TR style="HEIGHT: 12.75pt" height=17><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black 0.5pt solid; BORDER-BOTTOM: black 0.5pt solid; HEIGHT: 12.75pt; BACKGROUND-COLOR: transparent" height=17>A</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" align=right x:num>6 out of total 10</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" align=right x:num>5</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" align=right x:num>21</TD></TR><TR style="HEIGHT: 12.75pt" height=17><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black 0.5pt solid; BORDER-BOTTOM: black 0.5pt solid; HEIGHT: 12.75pt; BACKGROUND-COLOR: transparent" height=17>B</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" align=right x:num>14</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent"> 10</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent"> 22</TD></TR><TR style="HEIGHT: 12.75pt" height=17><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black 0.5pt solid; BORDER-BOTTOM: black 0.5pt solid; HEIGHT: 12.75pt; BACKGROUND-COLOR: transparent" height=17>C</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent" align=right x:num>30</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent"> 20</TD><TD class=xl22 style="BORDER-RIGHT: black 0.5pt solid; BORDER-TOP: black; BORDER-LEFT: black; BORDER-BOTTOM: black 0.5pt solid; BACKGROUND-COLOR: transparent"> 10</TD></TR></TBODY></TABLE>

So when i start from DAY 1 I would like to demonstrate the progress of how many test data I created under each interface for each workstream. So by looking at the graph one should be able to say for example: Workstream A needs setup for three interfaces and test data setup on interface 1 is 60% complete(as 6 out of 10). This %age progress bar will change everyday. So if tommorrow I setup one more data, my progress would become 70% and likewise.

How can I show progress bar in a stacked column graph where I can show progress of test data creation in each interface?

Please help

Sid
 

Excel Facts

Best way to learn Power Query?
Read M is for (Data) Monkey book by Ken Puls and Miguel Escobar. It is the complete guide to Power Query.

Forum statistics

Threads
1,223,236
Messages
6,170,917
Members
452,366
Latest member
TePunaBloke

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top