Scatter Plot Timeline

Rcaaa

New Member
Joined
May 21, 2018
Messages
23
Hello,

I used a scatter plot to create a time line. It is based on a dynamic data.

Every time I change the data set to show a different project, I have to readjust the graph size to make it smaller or larger based on the size of the data set.

Does anyone know if there is a way to have the chart dynamically change with the data set?


I used the following array formula to pull the information into the chart.
=IF(ROWS(B$7:B7)>$B$4,"",INDEX(Tasks!B$3:B$75,SMALL(IF(Tasks!$A$3:$A$75=$B$2,IF(Tasks!$B$3:$B$75=$B$3,ROW(Tasks!$B$3:$B$75)-ROW(Tasks!$B$3)+1)),ROWS(B$7:B7))))

Thanks,

RCAAA
 

Excel Facts

Square and cube roots
The =SQRT(25) is a square root. For a cube root, use =125^(1/3). For a fourth root, use =625^(1/4).

Forum statistics

Threads
1,223,227
Messages
6,170,848
Members
452,361
Latest member
d3ad3y3

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top