S-Curve Modelling?

mattrich

New Member
Joined
Apr 10, 2015
Messages
1
Hi all. I am trying to build a ramp-up curve (s-curve) based on a set of defined assumptions. Unfortunately my curve always starts above 0 (as I cant work out how to start the curve with a defined miminum value) and I cant work out how to fix it. I thought that it may be due to the data showing from the end of the first period, but it just seems to start too high to be the issue (eg starts at 22,000 when my limit is ~750,000. Does anyone have any suggestions on how to fix the issue? Thanks. Matt
 

Excel Facts

Can you sort left to right?
To sort left-to-right, use the Sort dialog box. Click Options. Choose "Sort left to right"
right click on your axis->format axis->first tab->set the minimum and maximum to your liking.
 
Upvote 0

Forum statistics

Threads
1,223,910
Messages
6,175,316
Members
452,634
Latest member
cpostell

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top