real estate land development model waterfall issue

randy_t

New Member
Joined
Sep 18, 2017
Messages
1
I created a land development waterfall model for GP/LP flows using certain hurdle rates and promotes. It works fine in the base case. In the distressed case, meaning slower land sales, the IRR hurdle rates don't work because there is a need for cash later but it wasn't reserved for and I'm at a loss on how to reserve for it accurately. Anyone run into this before? Thanks in advance.
 

Excel Facts

How can you turn a range sideways?
Copy the range. Select a blank cell. Right-click, Paste Special, then choose Transpose.

Forum statistics

Threads
1,223,228
Messages
6,170,871
Members
452,363
Latest member
merico17

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top