R12 calculation with fixed dates

cajste

Board Regular
Joined
Oct 22, 2012
Messages
67
Hi,

I am trying to create R12 calculation with fixed dates but can't get it to work. My attempt looks like below, what am I doing wrong?

CALCULATE([Actual (SEK)];DATESBETWEEN('Calendar'[Date]; 'Calendar'[Date]="2019-10-01";'Calendar'[Date]="2020-09-30"))

//Caj
 

Excel Facts

How can you turn a range sideways?
Copy the range. Select a blank cell. Right-click, Paste Special, then choose Transpose.

Forum statistics

Threads
1,225,657
Messages
6,186,257
Members
453,347
Latest member
mrizkiii28

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top