A company has decided to produce the product in standard shipping batches. To cope with the new product, an adjustment to production needs to be made on the lines that will make it. The company has given you the following information
I want to use solver to
Product A | Product B | New Product | |
Profit (Objective) | £500 | £750 | £1,100 |
Batches to make | ? | ? | ? |
Materials required per pallet type | Materials required per pallet type | Materials required per pallet type | Available | Units | |
Semi-skilled labor time | 50 | 50 | 100 | 6000 | Hours |
Skilled labor time | 5 | 15 | 10 | 800 | Hours |
Materials | 500 | 400 | 300 | 31,000 | Units |
I want to use solver to
- Design an optimizer on excel and use solver to find out how many batches of each product to make to maximize profit
- model a reduction in skilled labor hours by 100 to 700