Hello,
I am trying to create an odometer chart which I've successfully done using one of several online posts on this topic (combining a doughnut and pie chart). However, I'd like two have two 'needles' on my chart. I've added a second pie graph to do this but the problem is, my needles won't overlap.
So the first one (actual) remains on the outer ring of the doughnut chart and doesn't reach to the center of the chart and my second one (target) is stuck just in the center. Is there a way to reformat my charts to get them to overlap and have both needles still visible?
Thanks in advance!
I am trying to create an odometer chart which I've successfully done using one of several online posts on this topic (combining a doughnut and pie chart). However, I'd like two have two 'needles' on my chart. I've added a second pie graph to do this but the problem is, my needles won't overlap.
So the first one (actual) remains on the outer ring of the doughnut chart and doesn't reach to the center of the chart and my second one (target) is stuck just in the center. Is there a way to reformat my charts to get them to overlap and have both needles still visible?
Thanks in advance!