Hi There,
I need a bit of direction. I've 3 criteria ( Stage1,2,3) and based on each criteria I need to calculate networkdays, Which isn't too difficult and I managed. What I need is if its stage1 the difference betwen dates if less then 10 then pass else fail. In stage 2 the diifference is 20 days or more then fail and for stage3 is if difference is less then 30 days then pass else fail.
I can do first criteria, but to merge i'm not getting my head around.
Please help!
I need a bit of direction. I've 3 criteria ( Stage1,2,3) and based on each criteria I need to calculate networkdays, Which isn't too difficult and I managed. What I need is if its stage1 the difference betwen dates if less then 10 then pass else fail. In stage 2 the diifference is 20 days or more then fail and for stage3 is if difference is less then 30 days then pass else fail.
I can do first criteria, but to merge i'm not getting my head around.
Please help!