Hi,
I work in contracting. I have 10 contracts I have bid on, each with a different probability of being awarded to me.
I know the start date, end date, and average manpower needed to complete each job. I want to plot a manpower chart for each job, weighted by the percentage of winning, with the correct start and end dates. Then, I want to plot the cumulative results across all ten jobs, and the entire date ranges, in order to be able to project my upcoming manpower needs.
Can someone please help me with this?
Thanks
I work in contracting. I have 10 contracts I have bid on, each with a different probability of being awarded to me.
I know the start date, end date, and average manpower needed to complete each job. I want to plot a manpower chart for each job, weighted by the percentage of winning, with the correct start and end dates. Then, I want to plot the cumulative results across all ten jobs, and the entire date ranges, in order to be able to project my upcoming manpower needs.
Can someone please help me with this?
Thanks