Hey all,
All over Christmas I've been trying to find a way to do this (sad i know) but have come up with zilch, my brain just wont let me find a way to do it so im hoping someone else could point me in the right direction.
My works rota spreadsheet (which all stores have to use) works in format of entering a 1 under each full hour worked, if you work half an hour in that hour (the image I've attached will explain it better)
This is time consuming and awful, im wondering is there any way (ideally without vba) that I can enter a start time and finish time (like on the left in the pic) and it to populate the correct format for my works rota spreadsheet (like on the right).
I think the way they so this is that it feeds into their payroll system and it has to be that format.
Any ideas? Im open to VBA solutions if that's the last resort, its just my works excel has VBA disabled so testing at work is a once a shift thing.
Thanks for any solutions
All over Christmas I've been trying to find a way to do this (sad i know) but have come up with zilch, my brain just wont let me find a way to do it so im hoping someone else could point me in the right direction.
My works rota spreadsheet (which all stores have to use) works in format of entering a 1 under each full hour worked, if you work half an hour in that hour (the image I've attached will explain it better)
This is time consuming and awful, im wondering is there any way (ideally without vba) that I can enter a start time and finish time (like on the left in the pic) and it to populate the correct format for my works rota spreadsheet (like on the right).
I think the way they so this is that it feeds into their payroll system and it has to be that format.
Any ideas? Im open to VBA solutions if that's the last resort, its just my works excel has VBA disabled so testing at work is a once a shift thing.
Thanks for any solutions