fabiospark
New Member
- Joined
- May 29, 2015
- Messages
- 13
I'm building a portfolio performance line chart.
The length of the charted period (in working days) can be changed
through a combo box that dynamically changes the charted range.
All the periods in the list are a multiple of one week (5 working days) so the first day
on the left it will always be a friday. Each series plot will start in the same point
as all of their values are zeroes because I'm evaluating the performance of each series
against their friday values that so become a common floor.
To easily see where the weeks start (between friday and monday) I'm thinking to use
a grid with 5 points between each vertical lines but in this way, as far as I know, the first
left line of the grid will be on the left border of the plotting area, to the left of the first
category. Instead it would be very useful to be able to make the grid vertical lines start AFTER
the first category instead of BEFORE, as it normally is.
See the picture for a two weeks and a three weeks charts.
Thanks for listening.
The length of the charted period (in working days) can be changed
through a combo box that dynamically changes the charted range.
All the periods in the list are a multiple of one week (5 working days) so the first day
on the left it will always be a friday. Each series plot will start in the same point
as all of their values are zeroes because I'm evaluating the performance of each series
against their friday values that so become a common floor.
To easily see where the weeks start (between friday and monday) I'm thinking to use
a grid with 5 points between each vertical lines but in this way, as far as I know, the first
left line of the grid will be on the left border of the plotting area, to the left of the first
category. Instead it would be very useful to be able to make the grid vertical lines start AFTER
the first category instead of BEFORE, as it normally is.
See the picture for a two weeks and a three weeks charts.
Thanks for listening.