tonylephard
New Member
- Joined
- Mar 2, 2017
- Messages
- 2
First time poster
I need to automate the following. every time i add a week (7 days) to B1 I would like the date in C1 to be increased by 4 weeks (28 Days)
A1 B1 C1
[TABLE="width: 356"]
<colgroup><col><col span="3"></colgroup><tbody>[TR]
[TD]John Smith[/TD]
[TD]21-Feb[/TD]
[TD]-[/TD]
[TD]19-Sep[/TD]
[/TR]
</tbody>[/TABLE]
I hope someone can help
I need to automate the following. every time i add a week (7 days) to B1 I would like the date in C1 to be increased by 4 weeks (28 Days)
A1 B1 C1
[TABLE="width: 356"]
<colgroup><col><col span="3"></colgroup><tbody>[TR]
[TD]John Smith[/TD]
[TD]21-Feb[/TD]
[TD]-[/TD]
[TD]19-Sep[/TD]
[/TR]
</tbody>[/TABLE]
I hope someone can help