I am behind schedule and need a formula

imrar

New Member
Joined
Jul 21, 2009
Messages
3
I have been watching tutorials on youtube for two days now, and I have yet to run across what I need.

Here is the layout
Sheet 1 is laid out

A column "albums" B column "song" C column "artist" D column "tier".
"Tier" is a ranking, by song, to categorize use and potential productivity of said song.

Sheets 2 through 4 are then corresponding to the rank. Sheet 2 is tier 1, sheet 3 is tier 2, 4 is tier 3.

What I need is set sheets 2-4 up so that every time a "1" shows up in the "tier" column of sheet 1, it transfers the data from the other columns to the corresponding columns in sheet 2. So line 1 on sheet 2 would contain the first time a 1 showed up in the "tier" column and so on.

Then in sheet 3 would appear on the 1st line the 1st time the number 2 showed up in the "tier" column of sheet 1. In the 2nd line would be the 2nd time. Likewise would be in sheet 4 for every time 3 showed up in the "tier" column.

In essence if it was a phonebook, I am looking to pull all the times smith shows up in sheet 1 and place his info on sheet 2, and every time Jones showed up it goes in sheet 3.

It has been a long time since programming Excel and it was on Office 98'. Things have changed so much that I am just lost. And I can't remember what I used to know on 98'. Please I need help. I am falling behind schedule because of this one formula. I cannot continue with my other formulas without the data transferring to these sheets. And I unfortunately do not have the time to read through all the posts to see if it is already here. :(

Thanks all


<input id="gwProxy" type="hidden"><!--Session data--><input *******="jsCall();" id="jsProxy" type="hidden">
<input id="gwProxy" type="hidden"><!--Session data--><input *******="jsCall();" id="jsProxy" type="hidden">
<input id="gwProxy" type="hidden"><!--Session data--><input *******="jsCall();" id="jsProxy" type="hidden">
 

Excel Facts

Why does 9 mean SUM in SUBTOTAL?
It is because Sum is the 9th alphabetically in Average, Count, CountA, Max, Min, Product, StDev.S, StDev.P, Sum, VAR.S, VAR.P.

Forum statistics

Threads
1,223,565
Messages
6,173,078
Members
452,500
Latest member
FrankSit

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top