I'm trying to determine how to calculate lead time based on work days.
Initial Date: 6/1/09 (Cell B66)
Lead Time: 72 business days (Cell C68)
X: This is what I'm trying to solve for, which would be 72 business days from B66 (Cell D68).
Desired output is date format of B66+C68 with only business days
Note: I am using add-in Analysis Tool Pack
Thanks!
Initial Date: 6/1/09 (Cell B66)
Lead Time: 72 business days (Cell C68)
X: This is what I'm trying to solve for, which would be 72 business days from B66 (Cell D68).
Desired output is date format of B66+C68 with only business days
Note: I am using add-in Analysis Tool Pack
Thanks!