Suppose i have two dates one is plan and second is actual plan date is when the job is to be done and actual is when the job had actually done based on thesr condition i want to know three things
1) how much jos asigned had done
2) how much late has been done
3) how much dealy had been made.
Through vba and formula...
1) how much jos asigned had done
2) how much late has been done
3) how much dealy had been made.
Through vba and formula...