For all:
I'm using Excel 2007. I need to calculate the maturity date on a spreadsheet of loans of varying term lengths. I have the "first payment date" (always the first of a month) in Column C, and I have the term of the loan (in months) in Column H. I need to calculate the Maturity date in Column D. For Example:
C1= 01/01/2012
H1= 180
D1 should be 12/01/2026?
Thanks in advance for a prompt reply!
I'm using Excel 2007. I need to calculate the maturity date on a spreadsheet of loans of varying term lengths. I have the "first payment date" (always the first of a month) in Column C, and I have the term of the loan (in months) in Column H. I need to calculate the Maturity date in Column D. For Example:
C1= 01/01/2012
H1= 180
D1 should be 12/01/2026?