I'm a self-taught Excel user and have no experience on formulas and am nearly innumerate so please be gentle with me ...
I'm sure there is a way to do this:
I need to calculate helicopter load timings. Say I have 30 passengers, I know I need 5 helicopter movements to transport them from point A to point B to point C. The first movement takes 12 minutes then there is a wait of 10 minutes and the second movement is 8 minutes.
That scenario will be repeated 4 times, but each departure time will be 5 minutes later to allow for unloading/loading passengers.
This 5-heli scenario will be repeated up to three times, depending on whether I have 90, 100, 140 pax, etc.
Currently I am adding the separate times onto each departure time but if there was a way to automate the process of time stepping I would save a lot of time and bad arithmetic.
Thanks in advance to anyone who can help me with this.
I'm sure there is a way to do this:
I need to calculate helicopter load timings. Say I have 30 passengers, I know I need 5 helicopter movements to transport them from point A to point B to point C. The first movement takes 12 minutes then there is a wait of 10 minutes and the second movement is 8 minutes.
That scenario will be repeated 4 times, but each departure time will be 5 minutes later to allow for unloading/loading passengers.
This 5-heli scenario will be repeated up to three times, depending on whether I have 90, 100, 140 pax, etc.
Currently I am adding the separate times onto each departure time but if there was a way to automate the process of time stepping I would save a lot of time and bad arithmetic.
Thanks in advance to anyone who can help me with this.