I've looked high and low and cannot seem to find the answer to this. I am looking to show registration progress since the start date of the project.
Basically, we rolled out a new program and have had difficulty getting some of the people to register for it. I would like to show a combo graph showing weekly registration with total registration over the top. I feel like this should be easier than it is, but I cannot seem to figure out how to do it.
I would like the bottom axis to be the week number and the progress axis on the Right. I would like the bar graph to be the week to week progress (show progress for that specific week) and the line graph to show overall progress.
Any suggestions?
Basically, we rolled out a new program and have had difficulty getting some of the people to register for it. I would like to show a combo graph showing weekly registration with total registration over the top. I feel like this should be easier than it is, but I cannot seem to figure out how to do it.
I would like the bottom axis to be the week number and the progress axis on the Right. I would like the bar graph to be the week to week progress (show progress for that specific week) and the line graph to show overall progress.
Any suggestions?