NonStopLeo
New Member
- Joined
- Mar 25, 2010
- Messages
- 38
Modification to the attached excel sheet that uses Microsoft Power Query as follows. Keep all functionality working with these modifications. Employee Schedule Sheet- Option to sort by trade I would like the option to sort by trade then jobsite then alphabetical… Also dates should remain in Monday, Tuesday, Wednesday, Thursday, Friday, Saturday order, and relist the Job EACH Day. This will help when I guy is moved back and forth from a job mid week. Dashboard Sheet- It would be beneficial to DISPLAY the Manpower needs by trade on any given bar without going through and selecting all the projects that have Pipe, Sheet, or Plmb after it. For instance can they have their own COLOR of the bar. So all jobs that end with SHEET can be totaled, all jobs that end with PIPE can be totaled and would stack ontop of the bar with SHEET, same with PLMB. So we can see how much of each bar is PIPE vs PLMB vs SHEET. Same thing with Potential Projects, Break this bar into the three trades. On the Current Projects Page. I would like a tool developed that would allow for quick copying of the previous week assignments forward. For instance take all the assignments made on date 05/04/18 and copy that forward for a period of time that can be selected by the user, as an example it could be Monday through Friday (Or Saturday if needed) for the next six weeks. A couple clicks and this is accomplished.
File is given in below link
https://jumpshare.com/v/FeTu9V3ZeKOy5LtrfC4e
File is given in below link
https://jumpshare.com/v/FeTu9V3ZeKOy5LtrfC4e