Hi all,
So, I've two fields with week numbers. One consisting of the week number in which an activity starts (StartWeekNumber) and one with the end week numbers (FinishWeekNumbers). I'm constructing a graph with on the x-axis as a minimum the StartWeekNumber and as a maximum the FinishWeekNumber. How could this be done?
So, I've two fields with week numbers. One consisting of the week number in which an activity starts (StartWeekNumber) and one with the end week numbers (FinishWeekNumbers). I'm constructing a graph with on the x-axis as a minimum the StartWeekNumber and as a maximum the FinishWeekNumber. How could this be done?