Good Morning,
The context is as follows: A Project Physical Progress Curve.
The project consists of four Sequences (1,2,3 and 4) that include several activities, each sequence has its own curve (4 curves) and there is a general curve of the project. All curves are ready as you can see in the attached spreadsheet.
What I need to do is create a dynamic control (check box, combo box, does not matter at all) and then also enter slicers on the chart so I just choose what I want to show (Sequence 1, 2, 3 or 4 or General curve) and appear on the graphic.
Here's a link to access the spreadsheet:
https://drive.google.com/open?id=0B3oW9TEhhAioeU8xVE9lVkZRRFU
Thanks,
André.
The context is as follows: A Project Physical Progress Curve.
The project consists of four Sequences (1,2,3 and 4) that include several activities, each sequence has its own curve (4 curves) and there is a general curve of the project. All curves are ready as you can see in the attached spreadsheet.
What I need to do is create a dynamic control (check box, combo box, does not matter at all) and then also enter slicers on the chart so I just choose what I want to show (Sequence 1, 2, 3 or 4 or General curve) and appear on the graphic.
Here's a link to access the spreadsheet:
https://drive.google.com/open?id=0B3oW9TEhhAioeU8xVE9lVkZRRFU
Thanks,
André.