download from blueprints

RoyS

New Member
Joined
Aug 5, 2010
Messages
37
How can i download the room schedule from a set of blueprints that were emailed to me? thank you
 

Excel Facts

Can Excel fill bagel flavors?
You can teach Excel a new custom list. Type the list in cells, File, Options, Advanced, Edit Custom Lists, Import, OK
Im not sure how to answer that. The blue prints are a digital form of a hard copy set of prints. I tried to copy, paste to MS Word, save as an .odt(?) file extension then open in Excel knowing i would have to select the delimited spacing options.
If i find something want in excel on the web i have been able to bring it into wordpad, save it as .csv extension and have no problem getting it in excel.
\That is why i tried the copy,paste and save method. Thanks
 
Upvote 0
Im not sure how to answer that.
If they were emailed to you, then they were in the form of a file attachment, no? If that's the case, what's the file extension of the file? What software was used to produce it? If you double-click it, what software does Windows start up to try to open it?
 
Upvote 0
I apologize for the late response. I have been looking into this matter and forget that i owed you an answer. Yes the file format is a pdf.
 
Upvote 0
If the information you want is in the PDF as text, you may be able to 'select all' then paste it directly into a worksheet. You'll probably have some tidying up to do afterwards though.

OTOH if the PDF was produced by scanning a piece of paper which I think is what you're suggesting, it's not going to be so easy. You might be able to run it through an OCR (optical character recognition) program but you'd have to ask yourself whether it would actually be quicker and easier just to retype the information than it would be to source, install and run an OCR program.

(I'm assuming you can't lay your hands on the original document.)
 
Upvote 0
Yes i believe it was "was produced by scanning a piece of paper" and i probably can't get my hands on the origional piece of paper, however i haven't yet called the architect (which as you may know is taboo, not really concerned though). The room schedule from the blueprints in this job has about 550 signs and room numbers, so i can type them.....


-- removed inline image ---
 
Upvote 0

Forum statistics

Threads
1,223,911
Messages
6,175,331
Members
452,636
Latest member
laura12345

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top