Hi Everyone,
I have struck a problem with a development spreadsheet I am working on. This is for a development / construction scenario. I know the total costs of the development, and how long each part will take. What I want is a formula to automatically spread the development costs based on the completion date, and number of months that part of the development takes. I have the month end dates running along the top of the top of the worksheet to the right, on the left I have a completion date for the project, a list of costs for the project, and how long each cost item will take. Eg, the total cost for housing is $1,000,000, and it will take 3 months to complete, so I want to put $333,333 into the completion month cell and previous 3 cells.
Using excel 2010
I am on a shared computer so cant install the add in to upload my workbook.
Thanks in advance.
I have struck a problem with a development spreadsheet I am working on. This is for a development / construction scenario. I know the total costs of the development, and how long each part will take. What I want is a formula to automatically spread the development costs based on the completion date, and number of months that part of the development takes. I have the month end dates running along the top of the top of the worksheet to the right, on the left I have a completion date for the project, a list of costs for the project, and how long each cost item will take. Eg, the total cost for housing is $1,000,000, and it will take 3 months to complete, so I want to put $333,333 into the completion month cell and previous 3 cells.
Using excel 2010
I am on a shared computer so cant install the add in to upload my workbook.
Thanks in advance.