DAX studio

dicken

Active Member
Joined
Feb 12, 2022
Messages
292
Office Version
  1. 365
Platform
  1. Windows
Hi,
Is it possible to use DAX studio without a connected data source,
I ask this because I was using it to build a date table from scratch which I then put into excel using a 'existing connections' and
pasting the code in., so the fact that a data source was connected it wasn't needed.

Richard.
 

Excel Facts

Easy bullets in Excel
If you have a numeric keypad, press Alt+7 on numeric keypad to type a bullet in Excel.

Forum statistics

Threads
1,223,655
Messages
6,173,616
Members
452,525
Latest member
DPOLKADOT

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top