Date projected based on a pass/fail result

cwcwcw

New Member
Joined
May 7, 2019
Messages
5
Hi, my worksheet has a date manually entered in A1, I use the formula =EDATE(A1,6) to project the date 6 months ahead in A2. In A3 I manually enter “pass“ of “fail“. I would like the date in A2 to only be projected if A3 reads “pass“. Thank you very much.
 

Excel Facts

Why are there 1,048,576 rows in Excel?
The Excel team increased the size of the grid in 2007. There are 2^20 rows and 2^14 columns for a total of 17 billion cells.
Hi there,

So in cell A2 you'd the following:

=IF(A3="pass",EDATE(A1,6),"")

Regards,

Robert
 
Upvote 0

Forum statistics

Threads
1,224,823
Messages
6,181,176
Members
453,021
Latest member
Justyna P

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top