Hi
I'm after a bit of help with a sheet.
I'm making a costing spreadsheet.
Essentially the way it works is that a customer gives me a spec of a piece of material that they need. E.g. Material X, 80mm x 60mm x 1.2 thick.
I have in stock, sheets of various materials in various thicknesses and sizes.
So far I have got the sheet to work as follows:
input the material: "Material X"
input the thickness required: 1.2
input X dimension: 80
input Y dimension: 60
The sheet then works out which sheet would be the most efficient to cut from.
In this case sheet to use = "250 x 300" would cut 12 per sheet and leave only 16% waste.
Now I need it to tell me the cost of that 250 x 300 sheet in 1.2 thick in material X
Now my brain has turned to mush and I can't figure out how to get it to do that.
Any ideas?
Thanks
James
I'm after a bit of help with a sheet.
I'm making a costing spreadsheet.
Essentially the way it works is that a customer gives me a spec of a piece of material that they need. E.g. Material X, 80mm x 60mm x 1.2 thick.
I have in stock, sheets of various materials in various thicknesses and sizes.
So far I have got the sheet to work as follows:
input the material: "Material X"
input the thickness required: 1.2
input X dimension: 80
input Y dimension: 60
The sheet then works out which sheet would be the most efficient to cut from.
In this case sheet to use = "250 x 300" would cut 12 per sheet and leave only 16% waste.
Now I need it to tell me the cost of that 250 x 300 sheet in 1.2 thick in material X
Now my brain has turned to mush and I can't figure out how to get it to do that.
Any ideas?
Thanks
James