techstyle20
New Member
- Joined
- May 14, 2012
- Messages
- 40
Hi,
I need to calculate an SLA.
I have 1 column called 'Date/Time Requested' containing the time and the date together, as in:
dd/mm/yy hh:00
I also have a second column called 'Date/Time Completed' containing the date and time in the same format as above.
I need a macro that compares the two and works out the following:
< 48 hours = "Within SLA"
> 48 hours = "Outside SLA"
Thanks in advance.
I need to calculate an SLA.
I have 1 column called 'Date/Time Requested' containing the time and the date together, as in:
dd/mm/yy hh:00
I also have a second column called 'Date/Time Completed' containing the date and time in the same format as above.
I need a macro that compares the two and works out the following:
< 48 hours = "Within SLA"
> 48 hours = "Outside SLA"
Thanks in advance.