I have a list of 10 tasks in column A.
Each of these 10 tasks is allocated varying percentages adding upto 100% of a project (column B). Ie. Task 1 represents 3% of the total project, task 2 represents 50% of the total project, etc.
In column C is the % complete or each task - for example 25% of task 1 is complete.
How do I calculate what percentae of the overall project is complete for each task in column D? I know the answer in my example for task 1 would be 0.75% but I dont know how to calculate this in excel.
Hope that make sense!
Each of these 10 tasks is allocated varying percentages adding upto 100% of a project (column B). Ie. Task 1 represents 3% of the total project, task 2 represents 50% of the total project, etc.
In column C is the % complete or each task - for example 25% of task 1 is complete.
How do I calculate what percentae of the overall project is complete for each task in column D? I know the answer in my example for task 1 would be 0.75% but I dont know how to calculate this in excel.
Hope that make sense!