I want to calculate a date with the following conditions. It must be at least two weeks into the future and must be a Friday.
For example - the base date is between 1/18/2003 - 1/24/2003 so the result should be 2/7/2003. Similarly, if the base date is 1/25/2003 - 1/31/2003 the result should be 2/14/2003.
Any ideas on how to accomplish this is much appreciated.