Best Optimization Method for..

rabbitfoot365

New Member
Joined
May 7, 2018
Messages
8
I have two base teams. And 10 other "bolt ons" that, depending on cost and attributes, could bolster either team to a winning status. Base Team 1 and Base Team 2 have costs and attribute/scores as do the bolt ons.

What is the best way to be able to show an y (cost), x (score) matrix where, depending on either cost or score modifications to one or all 12 components, each snapshot/input set would calculate an optimum combination.

So in other words need a changeable table that can instantly alter the matrix with a regression. Any ideas highly appreciated.
 

Excel Facts

Excel Wisdom
Using a mouse in Excel is the work equivalent of wearing a lanyard when you first get to college

Similar threads

Forum statistics

Threads
1,223,228
Messages
6,170,871
Members
452,363
Latest member
merico17

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top