Beam times

Pigrider02

New Member
Joined
Mar 9, 2023
Messages
2
Office Version
  1. 365
Platform
  1. Windows
I want to be able to automatically add the values from the chart to the right. Based on 1) beam size then length over 15' and then the items below the Main piece. which all have unique values based on the beam size. I'm probably confusing myself. My first post although I've used a lot of the formulas on here

B_28
1​
MAINBEAMField Skewed connectionSkew connectionstiffenersMoment ConnectionSplice WeldedSplice boltedSplice combination
w1793
1​
W14 x 2611'- 9 3/8
=1.5+3 rows below​
Beam sizeBase unitLength(1) Pieceswt (max)F/fskskcstiffMCSPWSPBSPC
a3
1​
L4 x 3 1/2 x 5/160'-10
0.25​
W 4-6
1.00​
0.15​
0.15​
(0.15)​
0.25​
0.50​
1.00​
1.25​
1.00​
a4
1​
L4 x 3 1/2 x 5/160'-10
0.25​
W 8-10
1.25​
0.15​
30​
0.15​
0.18​
(0.15)​
0.30​
0.75​
1.25​
1.50​
1.25​
em1
2​
PL3/4 x 121'- 6
0.8​
W 12-14
1.50​
0.25​
38​
0.20​
0.21​
(0.15)​
0.40​
1.00​
1.50​
1.75​
1.50​
3​
BOLT3/4" Dia.0'- 2W 16-18
1.75​
0.25​
50​
0.20​
0.24​
(0.20)​
0.50​
1.00​
1.50​
2.00​
1.75​
6​
BOLT3/4" Dia.0'- 2W21
2.00​
0.30​
57​
0.25​
0.27​
(0.20)​
1.00​
1.25​
1.75​
2.75​
2.25​
B_29
1​
MAINBEAMThis will be different based on chart to the rightW24
2.25​
0.30​
62​
0.40​
0.30​
(0.20)​
1.00​
2.00​
2.50​
4.00​
3.50​
w1336
1​
W18 x 6528'- 8 1/4
=1.75+1 row below​
W27
2.75​
0.40​
94​
0.40​
0.33​
(0.20)​
1.20​
2.25​
2.75​
4.10​
3.75​
p484
1​
PL3/8 x 51'- 2 1/2
1​
W30
3.50​
0.40​
132​
0.50​
0.36​
(0.25)​
1.30​
2.50​
3.00​
4.20​
4.25​
10​
BOLT7/8" Dia.0'- 2 1/4W33
4.25​
0.50​
152​
0.50​
0.39​
(0.25)​
1.40​
3.00​
3.50​
4.30​
4.50​
B_32
1​
MAINBEAMW36
5.00​
0.50​
210​
0.50​
0.42​
(0.30)​
1.50​
3.50​
4.00​
4.50​
4.50​
w2095
1​
W18 x 3528'- 9 1/16=1.75+ no rows below but the length is over 15' so add.25
3​
BOLT3/4" Dia.0'- 1 3/4
B_33
1​
MAINBEAM
w2129
1​
W18 x 3529'- 3
p459
1​
PL3/8 x 5 1/20'- 9
7​
BOLT3/4" Dia.0'- 1 3/4
B_34
1​
MAINBEAM
w2130
1​
W18 x 356'- 9 3/4
a270
2​
L4 x 3 x 5/161'- 2 1/2
p485
2​
PL3/16 x 4 1/21'- 3
5​
BOLT1" Dia.0'- 2
10​
BOLT3/4" Dia.0'- 1 3/4
B_35
1​
MAINBEAM
w2121
1​
W14 x 2219'- 2 1/2
a3
1​
L4 x 3 1/2 x 5/160'-10
a4
1​
L4 x 3 1/2 x 5/160'-10
a53
2​
L4 x 3 x 5/160'- 8 1/2
 

Excel Facts

Which came first: VisiCalc or Lotus 1-2-3?
Dan Bricklin and Bob Frankston debuted VisiCalc in 1979 as a Visible Calculator. Lotus 1-2-3 debuted in the early 1980's, from Mitch Kapor.
Well, I have absolutely no idea what you're trying to achieve. Your table doesn't have formulas as well.

One example tells more then thousand words, so maybe you could make a little table with minimum sample data and the desired result directly in Excel and post a screenshot.
 
Upvote 0

Forum statistics

Threads
1,223,911
Messages
6,175,324
Members
452,635
Latest member
laura12345

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top