karthuappu
New Member
- Joined
- May 31, 2019
- Messages
- 10
[FONT="]I need to update this table of sorts every week, i have made 3 iterations for the same in the sheet attached. But in the main sheet i only have one table within which all modifications would be done. The process usualyy takes a few minutes is there any way to spped it up using either macros or anything else.[/FONT]
[FONT="]can someone please help.[/FONT]
[FONT="]Thanks.
Also posted on
[/FONT]https://chandoo.org/forum/threads/automating-with-merged-cells.41896/
Im unable to attach the file here it is attached to the other link
[FONT="]can someone please help.[/FONT]
[FONT="]Thanks.
Also posted on
[/FONT]https://chandoo.org/forum/threads/automating-with-merged-cells.41896/
Im unable to attach the file here it is attached to the other link