Hi all, I need to create a pie chart for work showing job failure categories, and the percentage that they can be attributed to the failure. For example I have a list of reasons for failure:
1. Train was late
2. Train was late
3. Staff didn't turn up
4. Machine broke down
The pie chart will looks through the column, and produce a chart showing "Train was late" as 50%, "Staff didn't turn up" as 25%, and "Machine broke down" as 25%. I need it to update automatically, and ignore blank cells. Is this possible?
1. Train was late
2. Train was late
3. Staff didn't turn up
4. Machine broke down
The pie chart will looks through the column, and produce a chart showing "Train was late" as 50%, "Staff didn't turn up" as 25%, and "Machine broke down" as 25%. I need it to update automatically, and ignore blank cells. Is this possible?