Is it possible to have Excel advance the date by one for each copy of the workbook I print? I have a workbook with names on it, used to sign out equipment. The workbook has 6 separate sheets in it. I have the date in one cell on each sheet (it's the same cell on each sheet). Currently I print one copy, change the date on all 6 sheets (using find and replace), then print, change the date on all 6 sheets, then print, and so on and so on. Is there a way to automate this, so that I can put in the start date, tell it I want 30 copies and it will change the date (on all 6 sheets) after it prints each copy? Hope that makes sense.Thanks.BJTred