Hello.
I'm having a hard time with the power query language.
I need help making my calculated column to show time between two dates but only using workdays.
I currently only have the two date/time columns being subtracted.
= Table.AddColumn(#"Renamed Columns1", "Overall Approval Time", each...
Oh, these supposedly simple things are driving me nuts.
I have two times on the same day:
9:55:22
9:58:44
How do I calculate the number of total seconds between these times? (202 seconds)
Your assistance is always appreciated.
Steve
We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel
Which adblocker are you using?
Disable AdBlock
Follow these easy steps to disable AdBlock
1)Click on the icon in the browser’s toolbar. 2)Click on the icon in the browser’s toolbar. 2)Click on the "Pause on this site" option.
Go back
Disable AdBlock Plus
Follow these easy steps to disable AdBlock Plus
1)Click on the icon in the browser’s toolbar. 2)Click on the toggle to disable it for "mrexcel.com".
Go back
Disable uBlock Origin
Follow these easy steps to disable uBlock Origin
1)Click on the icon in the browser’s toolbar. 2)Click on the "Power" button. 3)Click on the "Refresh" button.
Go back
Disable uBlock
Follow these easy steps to disable uBlock
1)Click on the icon in the browser’s toolbar. 2)Click on the "Power" button. 3)Click on the "Refresh" button.