Hi
In cell P25 I require an actual hours minutes value based on the value in G25/ the value in N25 rather than a number calculation.
I have changed P25 to hh.mm but confused as to the formula as G25 and N25 are numeric values ( in this case 258.5/133.3)
Thanks Stephen