  1. A

    Calculate number of sickness days with rolling shift patterns

    I am looking to find out if there is a way to use excel formula to work out the cumulative number of working days a employee has been absent for when they work shift patterns So if the shift patterns are 4 on 4off, 2 days week one and 5 days week day two and the last shift pattern we have is 2...
  2. P

    Variable scheduling dates with holidays

    I'm preparing a weekly work schedule, with Xmas holidays in-between. The start date is not yet ascertained, so I need to be able to vary it, and then the weekly dates automatically flowing on. So, I'm looking for a formula that would automatically adjust the weekly dates, based on the project...
  3. X

    Why use array formula for networkdays when you could use networkdays.intl

    Hello I'm picking up on the excellent homepage article below: https://www.mrexcel.com/excel-tips/calculate-workdays-for-5-6-and-7-day-workweeks/ While this is a great way to achieve this outcome, I was intrigued with whether the networkdays.intl could not be used instead of the suggested...
  4. R

    Exclude start date while calculating number of work days?

    Hello Everyone, Greetings for the day! I'm looking for the solution in calculating number of days in which start date could be excluded. Note: putting "-1" in function will not work as I'm already excluding Sundays and Holidays. If work starts on Sundays or on any holidays "-1" will further...
  5. U

    Networkdays.intl

    I have a facility that operates 6-days a week Mon - Saturday. I need to be able to calculate the net workdays. In cell L2 is the month. For the normal workweek Mon-Friday I have the following formula "=NETWORKDAYS(L2,EOMONTH(L2,0))". Reading about the NETWORKDAYS.INTL I see you can designate the...
  6. A

    Need last workday with Mon's & Tue's off

    Hello all, I have this formula in B1 to find the last workday of the month having Mondays and Tuesdays off: =WORKDAY.INTL(A1,NETWORKDAYS.INTL(A1,EOMONTH(A1,0),3)-1,3) which goes down the column to B12, with A1:A12 varying from A1=01/01/2018 to A12=12/01/2018. It all works well except for Jan...
  7. A

    Downtime Report - Get working hours between two date/time stamps less holidays and weekends only counting working hours

    Hi there, I am needing help on a formula to calculate the working hours between two date/time stamps - less weekends and holidays that I define. I have searched threads for days and cannot get it to work. Working Hours (EST): 8:00am - 10:00pm Weekends: Saturday & Sunday Holiday: Sheet 1, Column...
  8. D

    Help with Formula to Calculate Days Passed

    Hey everyone, Thanks for taking the time to read and help me with this Particular formula. I'm a GSM for 2 Dealerships. I created a spreadsheet to help keep a tally of sales throughout the month along with a "ON PACE" formula to help gauge where we're headed based off the number of sales...
  9. A

    Counting down workdays - how to stop at one?

    I want excel to count down the remaining workdays I have, and so far it works like this: =NET.WORKDAYS.INTL(TODAY()+1;A47;"0010011") Green = returns the date today Orange = the last date of work this month (I can a list of working hours on the same spreadsheet) Blue = days at work is 0, days...
  10. T

    NETWORKDAYS.INTL problems

    Hello all, I will try to keep this as short an concise as possible. I am trying to determine the age of invoices. I am using the NETWORKDAYS.INTL function At our company, invoices do not start aging until the day after they are signed. So if it is signed 10/14/15, day 1 is actually 10/15/15 In...
  11. J

    Calculating business hours between two dates

    I need to calculate response times in business hours either same day or between 2 days. Business hours are M-F 8-8 and Sat 930a-1230p. I don't care about holidays and response time hours could be greater than 24 hours. I need to deliver h:mm result only counting business hours. a1 start date...
  12. Y

    Calculating days

    Hi, I'm trying to get the sum of workdays between 2 given dates (A1 is the start date and B1 is the end date) with Saturday as the only non-workday (I'd like to exclude Saturday only) I used Networkdays.intl in excel 2010 for this, but I have excel 2007 on my computer. How would I do it in Excel...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top