mrp

  1. B

    Automatic MRP forecast - help needed

    Hi All, Im building automatic order point but hit some wall :( Maybe anyone here is happy to help :confused: ? I have managed to calculate weeks of cover but I want to now add formula with allow me to : -if weeks of cover lower then 3 place an order -calculate quantity for "planned orders" to...
  2. R

    Material Requirement Planning (MRP) PowerPivot Model

    Hi, I just want to know if anybody have built a MRP model using Power Pivot. Basically the inputs for the MRP model are initial stock, consumption (sales & bill of materials), up coming purchase order and final inventory. Thanks
  3. L

    Kindly help to update to this fill

    HEY GUYS PLEASE HELP THERE 3 WORKSHEETS SHEET 1 <colgroup><col><col span="2"></colgroup><tbody> PRODUCT MRP QTY AA 120 2 BB 121 3 CC 122 4 DD 123 5 EE 124 6 FF 125 7 GG 126 8 HH 127 9 II 128 10 </tbody> <colgroup><col><col span="3"></colgroup><tbody> </tbody>...
  4. A

    data validation

    Please help i have an excell which contain two pages.first page only mrp colum which is balank where i should enter the mrp . second sheet contain all details of diifrent products having same mrp.if i enter an mrp on the first coloum on the firt sheet all details of the all the product of same...
  5. N

    Advanced formula, basic MRP, Not sure if possible on excel.

    <colgroup><col><col><col><col span="2"><col><col><col><col><col><col><col></colgroup><tbody> Hi All, I've been tasked with making a very basic MRP and hope someone can help me automate it a bit. Our products only go down one level, so I think it's doable, but the way...
  6. L

    VBA - Need help/ideas on creating loop that simulates a MRP program such as SAP

    Hello, This is my first post, so please forgive me if I post any noob/dumb stuff with this post. I'm a bit stumped though with regard to writing this macro. The premise of the Macro is to simulate MRP within Excel. The first procedure is a simple calculation that takes the starting stock level...
  7. F

    Material Requirements Planning (MRP) - Planned Orders

    Hello, I would like to ask about the Planned Order Receipts in MRP (independently of what Lot Sizing Rule is being used). When is the Planned Order Receipts section different from the Net Requirements section? What constraints must be given in order to have that difference in the quantity of...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top