maintenance

  1. T

    Only Run Formula on Cells in The Table.

    Hi all! When I open my excel book it takes forever to open due to poor coding on my part. I have a bunch of codes like the below code. What I want is instead of E:E which I believe is why it takes so long to open I only want it to check cells in the actual table or until it hits a blank. I...
  2. M

    VBA Loop Copy & Vertical Paste 2 data points based on [3rd] Criteria

    I have some data that I need to flip and copy & paste vertically based on the value at the intersection of a row & column. Below is the data as it is currently & how I need it to look. The result is based on where the policy is marked as 'Required' for that job & policy. I have tried various...
  3. R

    CheckDate box date vs today

    Please help with the following as i am running into a brick wall here. i am writing a spread sheet for daily engine maintenance. I have already gotten if service due by hours working properly with the following code. Private Sub Worksheet_Calculate() If Range("G9").Value < 25 And...
  4. C

    Using excel VBA delete multiple lines in a active sheet

    Here is an example of what I have and what I would like to accomplish. <tbody> OPEN WORK REPORT Period NUMBER WORK ORDER DESCRIPTION TYPE 25524484 ACCIDENT accident rollover Period NUMBER WORK ORDER WORK ORDER DESCRIPTION TYPE 25858720 BULK ISSUE Bulk...
  5. J

    Run-time 2110: Can't move focus to the control

    I have a form that when the user double-clicks a listbox, the record is retrived and placed on the form for editing. I keep getting the runtime error when I try to clear the form. The code is below. 'Traverses form and clears contents from textboxes For Each cCont In Me.Controls...
  6. G

    VBA Copy-paste values based/fill cells based on on checkbox validation

    Hi all, I want to make a "simple" maintenance plan that can do following tasks: to check when opened if the planned maintenance week has passed or is this week on sheet2 column BG, and if the maintenance to specific machine number was not done (columns BK, BM, BO and BQ) and display the results...
  7. H

    Due date formula

    Hello, which formula could I use to find the due date of a maintenance contract based on the maintenance frequency (e.g. every 1 month), start date of the contract and today's date? Example: A security barrier contract: the contract is valid from 10/01/2018 till 10/12/2018. The frequency of...
  8. H

    Help in Excel formulas (maintenance schedule)!!

    Hello, I wou l'd be very grateful to the one who would be able to help me with this : I am trying to calculate the next due date based on today’s date and maintenance frequency (days, months and year)…. Would you be able to add your magical formula for the ‘maintenance period’ and ‘days to...
  9. hatman

    VBA Download Excel Repoort From an ASP Site

    Once upon a time our Maintenance department used a software package that sat on top of an Oracle Database within our network to manage all planned and unplanned Maintenance activities. A decade ago I built various automated reports from the background tables and created tools to allow the...
  10. S

    Copy data Dynamically to another workbook.

    Hello all, I have a situation where i have multiple plants sending me files that i copy and paste into a master workbook with all the plants info. I have found ways to copy from workbook 1 to workbook 2, but only with specific ranges or an entire sheet (sort of hard coded). What i want to do...
  11. Q

    Maintenance Schedule

    Hi there, I'm relatively new to Excel and I have created a Workbook with several tabs holding all our equipment, their service/PAT test dates and conditioned the cells to turn either red/yellow/green dependent on whether or not the date is satisfactory. As there are a large amount of equipment...
  12. B

    Using VBA to record a history of dates

    Good Afternoon, 1st time VBA user - please be gentle... I have built a schedule tracker for maintenance in Excel. Dates when maintenance has been completed is entered into Sheet 2 for the corresponding piece of equipment/task. From this date a 'next due' date is populated on Sheet 1. Sheet...
  13. J

    Issues with reverting numbers to dates

    Hi guys, See below, I have used the following formula intending to retrieve the red bits. =LOOKUP(MID(A2,3,2),$J$1:$K$5)&LEFT(C2,5)&"-"&D2&"_"&"PN_"&B2 instead, it Returns as: Finance_Department_43107-43287_PN_876789 I tried to Change the Format cells as Dates, it still won't work. oddly...
  14. P

    How to combine datasets

    I have three data sources that I need to consolidate into a single data source: 1. A list of maintenance periods which are uniquely (no repeats) identified by 4 letters and 3 digits, for example CANS118. The Maintenance Periods mentioned in the data sources below will be listed it this list...
  15. L

    VBA - create a Loop to distribute dates along a year as per Maintenance frequency

    Guys I have the scenario below where I would like to create a loop to distribute along the columns (G column on) the date that that maintenance will ocurr based on its ID, Frequency and Due date. I will distribute it for a period of 01 year (365 days or 365 Columns) For instance, the...
  16. D

    formula other than vlookup

    Hi All, i have a few hundred rows of data for maintenance for trucks and the the unique data is the registration (rego) with its status The rego could be in the column a few times as it might have a few maintenance issues. Once the maintenance issues have been fixed we change the status to...
  17. K

    Max & Min Value with multiple criteria

    Hello Experts, I need you help to calculate max and min values Based on Designations. Any suggestion please. Thanks, Kamran Noor <colgroup><col><col><col></colgroup><tbody> NAME DESIGNATION PAYROLL SAIRA MALIK ASSISTANT 19,180 FAIZA ALI ASSISTANT 19,970 MUHAMMAD IMTIAZ...
  18. W

    Help! Trying to calculate time differences between two different lists of timestamps!

    Hi! I have two lists of dates for a project, one is the Maintenance Dates and one is the Production Dates. I'm trying to figure out for each Production Date, how long has it been since the last Maintenance Date. The Maintenance Dates will be far less frequent than Production Dates, obviously...
  19. M

    A UDF for knowing when to perform a maintenance

    I want to write a UDF (maybe multiple ones) perform calculations for a fleet of vehicles as to when to perform a maintenance or quality check. Not so simple when I factor in some time frames (rated by mileage) these maintenance's need to performed. So my first scheduled maintenance is to be...
  20. S

    Merge two excel spreadsheets using a reference and return the notes field

    Hi can you help, I have two spreadsheets that i need to merge on a daily basis. Copy below. The number field is the unique reference. What I would like to do is find a formula that can look at the reference number in the master spreadsheet find the same reference number in the daily excel sheets...

We've detected that you are using an adblocker.

We have a great community of people providing Excel help here, but the hosting costs are enormous. You can help keep this site running by allowing ads on MrExcel.com.
Allow Ads at MrExcel

Which adblocker are you using?

Disable AdBlock

Follow these easy steps to disable AdBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the icon in the browser’s toolbar.
2)Click on the "Pause on this site" option.
Go back

Disable AdBlock Plus

Follow these easy steps to disable AdBlock Plus

1)Click on the icon in the browser’s toolbar.
2)Click on the toggle to disable it for "mrexcel.com".
Go back

Disable uBlock Origin

Follow these easy steps to disable uBlock Origin

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back

Disable uBlock

Follow these easy steps to disable uBlock

1)Click on the icon in the browser’s toolbar.
2)Click on the "Power" button.
3)Click on the "Refresh" button.
Go back
Back
Top